IBRD Loan: US$ 325.0 million equivalent
Terms: Maturity = 21 years, Grace = 7.5 years
Project ID: P123994
Project Description: The objective of the project is to meet growing electricity demand and increase access to electricity through strengthening and expanding the capacity of the power transmission networks in the project area.