Egypt - Helwan South Power Project
IBRD Loan: US$ 585.4 million equivalent
Terms: Maturity = 28.5 years, Grace = 7 years
Project ID: P117407
Project Description: The new gas–fired power plant will contribute 10 percent of Egypt’s much needed electricity generation needs to be added by 2018 and help deliver a more reliable supply of electricity to the economy.