IBRD Loan: US$100 million
Terms: Maturity = 24 years; Grace = 10 years
Project ID: P111163
Project Description: The objective of the project is to mitigate the risk of flooding, reduce groundwater overdraft, increase industrial and domestic water supply, and raise farmers' income from irrigated agriculture in the arid Turpan basin.