IBRD Loan: EUR€275.2 million
Terms: Maturity = 20 years; Grace Period = 8 years
Project ID: P108005
Project Description: The Corridor X Highway Project for Serbia aims to increase transport efficiency and improve traffic safety on the three project sections of Corridor X, between Nis and Dimitrovgrad and Leskovac and Donji Neradovac respectively, and to improve road management and road safety in Serbia.