Project concept descriptionCurrently Fierza dam spills only occasionally; typically once every two years however allowing the full supply level to be raised by up to two meters would provide circa 200Mm3 of additional storage enabling to limit the spill; increase power production and improved flood control for the Drin cascade. Objective of the Consultancy ServiceThe World Bank is looking to understand the potential project requirements so is looking for a consultant to develop an Options study to assess the raising of the full supply level of Fierza reservoir either 1 or 2m.