Emergency situations of such magnitude as the 2020 coronavirus pandemic can have a devastating impact on the lives and livelihoods of millions of people, especially the most vulnerable, as well as on the global economy. It is crucial that authorities use available public resources wisely to mitigate, contain, and quickly recover from the adverse effects of such situations.
timestamp

00:03 Good morning.

00:04 On behalf of

00:06 procurement for Development SCOP,

00:08 I invite

00:09 you to this event

00:11 on

00:12 public procurement,

00:13 legal and regulatory framework.

00:17 And procurement during emergencies

00:19 and lessons learned during

00:20 COVID-19.

00:23 And before the COP,

00:24 we would like to

00:26 thank

00:27 Hiba Vina,

00:28 the panelists,

00:29 keynote speakers,

00:30 Peter and Carrie,

00:32 and

00:34 discussant Belita and Io.

00:35 For joining this event.

00:37 Now

00:37 I request

00:39 Hiba

00:40 to start the event with a welcome.

00:41 Thank you.

00:45 Thank you,

00:45 Nagaraju.

00:46 Good morning.

00:47 Good afternoon.

00:48 Good evening,

00:49 everyone.

00:50 We're very excited to have you here today

00:53 with us to discuss this important uh session.

00:56 We have

00:57 a rich

01:00 uh partic experience from participants from different parts of the world.

01:04 And uh we would like to have this interactive discussion.

01:09 Manuela,

01:10 who is our moderator for this session,

01:12 will explain how the discussion will take place.

01:15 But first,

01:16 please allow me to welcome our keynote speaker,

01:20 Mr.

01:20 Peter Tripte.

01:22 He's a senior fellow in Public procurement law at the University of Nottingham

01:27 with

01:28 With huge and large experience.

01:30 For the interest of time,

01:32 I would only introduce the speakers and the panelists,

01:36 but their,

01:36 their bios are attached in the invitation

01:40 and I hope that you will all uh uh have a look at their bios after the meeting.

01:47 Uh,

01:47 with us also as a keynote speaker,

01:49 Ms.

01:50 Carrie Klutz.

01:51 Uh,

01:51 Ms.

01:52 Carrie Klutz is the head of the Country Programs,

01:55 Open Contracting

01:56 and Partnership.

01:58 And she will,

01:59 uh,

01:59 give us her experience on what transparency and what,

02:04 uh,

02:05 measures

02:06 can be done and can be,

02:08 uh,

02:08 required

02:09 during emergency operations and how

02:13 To ensure that what,

02:15 where the money is spent is known and where

02:19 the benefits have been attained.

02:21 I'm very pleased to

02:23 welcome

02:24 a few friends

02:26 from all over the world.

02:28 Mr.

02:28 Sahel Nang,

02:29 he is the Director General of Public Procurement in Senegal,

02:34 Ms.

02:34 Silvana Vallejo Paez,

02:36 Director General of Public Procurement in Ecuador.

02:41 Mr.

02:41 Abdus Sadeq Labdawi

02:43 from the min he's the ministerial treasurer of the Ministry

02:47 of Economic and Finance,

02:49 Ms.

02:50 Nugen

02:51 T

02:52 Tui Hang.

02:53 She's the deputy director

02:55 general of the Public procurement under Ministry of Planning.

02:59 And Claire,

03:01 Ms.

03:01 Claire Ifi,

03:03 Ili,

03:03 sorry,

03:04 she's in charge of the regulations and procurement and public procurement

03:09 and of the negotiation for France of European draft text relating

03:14 to public procurement.

03:16 We have esteemed,

03:17 very experienced uh uh panelists,

03:20 and I'm sure

03:22 we will learn and we will engage with them

03:25 to have the best out of this session.

03:28 The discussions are our Fearless Ladies of the World Bank,

03:32 Belita Menka,

03:33 she's a senior counsel from the World Bank.

03:37 uh Ms.

03:38 Ayo Akala,

03:40 Francesca

03:41 Ayodii Akala.

03:43 She's a practice manager for health and I can tell you,

03:46 she's one of the most busiest persons in the world right now.

03:50 Uh dealing with emergency all over Africa.

03:54 So welcome,

03:54 Ayo.

03:55 And finally,

03:57 our fearless moderator,

03:58 Manola Majo.

04:00 She's a procurement specialist

04:02 in,

04:02 in,

04:03 um,

04:03 in the,

04:04 in the Latin American region

04:06 of the World Bank.

04:09 These emergencies have put a lot of heads together to see how best to

04:16 respond,

04:16 how best to benefit those are affected.

04:19 The World Bank has

04:22 Been um

04:23 in many ways a leader in introducing

04:26 procedures and guidance on how to deal with emergencies,

04:30 whether it is

04:32 man-made emergencies,

04:34 natural emergencies that we have now,

04:36 which is global and I think in our lifetime,

04:39 this is the

04:40 uh the,

04:41 the severe,

04:43 the most severe uh emergency

04:46 that we have dealt with on a global level.

04:50 Or even a post war,

04:52 post-conflict.

04:54 So we have

04:55 procedures,

04:56 we have uh legal frameworks that we require in our operations.

05:02 But

05:03 the discussion today is how can we ensure

05:07 that the legal framework,

05:08 the procedures under emergency

05:11 can be

05:12 Really a driver to response,

05:15 can be really a driver to achieve results

05:18 and of course in a most transparent and in the most

05:22 uh um

05:24 effective way to the beneficiaries and to those who need it,

05:28 need it most.

05:29 We all understand that in emergencies,

05:32 chaos can come in

05:33 and chaos can open a lot of opportunities for

05:37 maybe misuse or leakages.

05:40 So we have our esteemed uh panelists and discussant to tell us

05:45 what could be done to minimize uh these,

05:48 uh these measures.

05:49 In the interest of time and because we want to hear from our

05:54 Um,

05:54 uh,

05:55 esteemed keynote speakers and then esteemed panelists.

05:59 I will stop here.

06:01 But last but not least,

06:02 I would like to introduce our our director,

06:06 Vinay Sharma.

06:08 He's the director of the,

06:09 uh,

06:10 he's the global director of procurement

06:12 in the World Bank and he oversees the procurement function

06:16 in implementation.

06:18 Welcome,

06:18 Vina,

06:19 please come in.

06:21 Thank you.

06:22 Uh,

06:22 I hope you're able to,

06:24 to hear me.

06:25 Uh,

06:26 thanks Nagaraja and Hiba for inviting me.

06:28 The topic being discussed is very timely,

06:31 and I'm happy that the community of practice has assembled this excellent panel.

06:35 To talk about the framework under

06:36 which public procurement operates under emergencies.

06:40 As you know,

06:41 COVID-19 crisis has left important lessons on governance

06:45 and enhanced collaboration on national,

06:48 regional

06:49 and international level,

06:51 as well as open and innovative ways to

06:53 promote dialogues between public and private stakeholders.

06:57 Public procurement

06:58 was and is a critical piece in the response from countries,

07:02 and it is fascinating to see the difference in responses by different countries.

07:07 Most countries use their established frameworks for emergency contracting,

07:11 ensuring the the necessary flexibility to respond to the extremely urgent needs,

07:17 but some

07:18 some countries developed additional guidance for this specific emergency.

07:22 We saw unprecedented conditions,

07:25 highlighted exposure of procurement systems to integrity risks,

07:28 and this is what Cuba was talking about.

07:31 Uh,

07:32 Perhaps not very surprisingly

07:34 that the reaction to transparency and accountability was unequal.

07:38 What was surprising was that while many

07:40 countries were affected by the crisis simultaneously,

07:43 we did not see coherent collaborative approaches.

07:47 Emergency situations generated conditions that encourage the improper use

07:51 of emergency funds and extraordinary budgets in some cases.

07:56 However,

07:58 to ensure the integrity of these

07:59 extraordinary resources for public purchasing and

08:01 contracting and the proper exercise of people's rights during the emergency,

08:06 many responsible governments increase transparency in the

08:08 use of open data through full,

08:10 continuous,

08:11 timely,

08:12 true,

08:12 and verifiable information

08:14 expressed in languages that could be understood by others.

08:17 Uh,

08:18 you,

08:19 you might perhaps know that the World Bank had carried out a study,

08:22 a survey of about 110 countries,

08:25 and we have found that the quality

08:27 of procurement systems actually had a direct bearing

08:31 on the health outcomes of different countries.

08:33 I am sure that the discussions today are going to enrich

08:38 our understanding of how,

08:40 how public procurement should

08:43 will

08:43 and can.

08:46 Help address emergencies in,

08:47 in countries.

08:49 Thank you very much for inviting me.

08:56 Many thanks Vinai for your opening remarks and

08:59 your continued support to our community of practice.

09:03 Now before going to our keynote speaker,

09:05 I would like to welcome all of you for joining us from all over the world.

09:10 Uh,

09:10 this event is organized by Community of Practice Procurement for Development,

09:13 and this event will take about 2 hours.

09:16 We are using a very innovative platform called Kudo,

09:19 and please

09:20 use your left side of the screen to,

09:23 uh,

09:23 channel through the language of your choice.

09:26 Uh,

09:26 we are also live streaming our event in,

09:28 uh,

09:28 uh,

09:29 other

09:30 social media and YouTube.

09:33 Um,

09:34 I will,

09:35 um,

09:35 ask all to have the the mic,

09:37 uh,

09:38 muted while you are not speaking and for

09:41 every one of you that is live connected,

09:42 please use the chat box to post your questions

09:45 and your comments to

09:47 our panelists.

09:52 Now,

09:52 uh,

09:52 let's move to our keynote speakers.

09:54 As Hiba introduced our first keynote speaker is Mr.

09:58 Peter Tripte.

09:59 He will share with us his academic perspective

10:02 on how to ensure compliance with core procurement principles

10:05 while procuring during state of emergency.

10:12 Thank you.

10:13 Thank you very much and thank you very much for inviting me to,

10:16 to this event,

10:17 which promises to be a really interesting one,

10:19 I think,

10:19 given the breadth of experience that we,

10:22 we have on the,

10:22 on the,

10:23 on the panel.

10:25 Um,

10:25 I've been asked to look,

10:26 I,

10:26 I,

10:27 uh,

10:27 Manola mentioned academic perspective.

10:29 I'm actually going to look at some of the,

10:31 the legal issues that I've been dealing with because I've been

10:33 helping some countries address some of the problems that have been raised

10:37 by the pandemic,

10:38 at least in terms of,

10:39 of procurement regulation.

10:41 And,

10:41 um,

10:42 I'd quite like it,

10:43 but it's,

10:43 it's much wider than,

10:44 than legal,

10:44 and I think that's one of the big problems that we're facing.

10:47 It's very easy to say,

10:48 oh,

10:49 get the lawyers to sort something out.

10:50 It,

10:50 it's not,

10:51 it's not that easy.

10:52 It doesn't work quite like that.

10:54 And I'm going to state the obvious at the beginning.

10:56 I mean,

10:57 the,

10:57 the,

10:57 the,

10:58 the people introducing the,

11:00 um,

11:00 the,

11:01 the,

11:01 the panel,

11:02 so Nagaraju and

11:03 uh Heva have already referred to it.

11:05 This is a pandemic without precedent.

11:07 I mean,

11:07 we haven't seen anything like this.

11:10 And of course it's caused legal problems,

11:12 but in all jurisdictions,

11:13 I mean,

11:14 uh,

11:14 in developed and in developing countries alike,

11:17 um,

11:18 yesterday,

11:18 I don't know if people have been following this,

11:20 but yesterday the National Audit Office in the United Kingdom,

11:23 the country that I'm from,

11:25 um.

11:26 Uh,

11:27 published a report,

11:28 uh,

11:28 which said that of the 18 billion pounds worth of contract,

11:31 that's almost $25

11:34 billion.24 something,

11:37 um,

11:37 most of those contracts were based on recommendations only

11:41 by ministers and different government advisors,

11:44 so there was no competitive procurement,

11:47 uh,

11:47 for that,

11:47 which is a pretty huge number that have failed to follow procurement rules,

11:51 and,

11:52 you know,

11:52 this is a,

11:53 Well,

11:54 it is a developed country,

11:55 but it's soon to become developing,

11:57 I think,

11:57 given it's decision to leave the European Union,

12:00 but that's a political statement.

12:02 And I'm sure Kerry will have something to say about this,

12:04 because the other thing that came out of this report

12:07 was that there were no records and no minutes of any meetings kept.

12:11 So everything was completely opaque

12:14 and non-transparent,

12:15 which of course means there was no possibility of verifying or even knowing.

12:20 Uh,

12:20 what happened.

12:21 So it's a pretty dreadful situation and the UK is

12:24 clearly not an example of how to do this,

12:26 um,

12:27 properly.

12:28 But I did say that it,

12:29 it's such an unusual situation.

12:31 I don't believe that any procurement system,

12:34 however well it's drafted,

12:35 however complete it is,

12:37 would be able to address all of the problems thrown up

12:40 by the pandemic.

12:42 Um,

12:42 and in,

12:43 and in some ways it's less a legal problem than a question of market failure.

12:47 There are huge problems of supply,

12:50 no supply of some product,

12:51 a lack of supply because we weren't ready for it of others,

12:55 but also of,

12:56 of countries leveraging their power and resources to stockpile,

13:00 um,

13:00 escalating prices,

13:01 not just a question of supply and demand,

13:03 but really unfair

13:05 and abusive pricing as well as fraudulent entrance,

13:08 uh,

13:08 which all leads to a higher risk of corruption,

13:11 and

13:11 there are lots of cases of contract non-performance.

13:14 So these are really.

13:16 Failures of the market,

13:17 uh,

13:17 an inability to address the problem and not really a legal issue.

13:20 I'm not trying to justify lawyers or excuse us

13:24 for having drafted bad regulations,

13:26 but I think it is way beyond just a legal question.

13:29 Although obviously that there are legal issues

13:32 um involved.

13:34 I think maybe one of the things that we could say also

13:37 is that

13:37 um

13:39 although the,

13:40 the initial problems do appear to be legal,

13:43 and of course,

13:44 where that's a problem of legislation,

13:45 we need to sort that out for the future,

13:48 um,

13:48 the scope and the severity of,

13:50 of the crisis means that there's much more that needs to be done.

13:53 There are very few emergencies on this scale,

13:56 but there are plenty of emergencies around and they are predictable.

14:00 Uh,

14:01 I'm thinking of things like the weather-based disasters,

14:03 hurricanes,

14:04 droughts,

14:04 floodings,

14:05 which I know a lot of the countries

14:07 that are participating on this panel,

14:09 uh,

14:09 will suffer.

14:10 Now we don't know when these are going to happen,

14:12 but we do know that they will happen and usually fairly regularly,

14:16 and we know what's needed.

14:17 They've happened before,

14:18 so we know what we need to deal with them.

14:20 And so the solution there is really to be prepared.

14:23 For those sorts of emergencies,

14:24 arguably,

14:25 we should have been prepared for this one,

14:27 scientists will tell us that

14:28 it was,

14:29 this was all completely foreseeable.

14:30 There was no,

14:31 not a surprise,

14:32 it's just the,

14:32 the timing was a surprise,

14:34 but it was going to happen.

14:36 So,

14:36 I think the best solution may well be that we should be prepared

14:39 and framework agreements,

14:41 which I know,

14:41 um,

14:42 I'm sure we'll be discussing at some point,

14:44 uh probably the best solution for dealing

14:47 with those sorts of predictable emergencies,

14:50 and that is to have available

14:52 a pool of suppliers and contractors at the ready so that when the emergency happens,

14:57 we're ready to deal with it.

14:58 We can do something about it

15:00 and not run around

15:01 uh trying to work out what,

15:03 what it is we can do.

15:06 Um,

15:07 now,

15:07 the,

15:08 what I've been asked to do is really to

15:10 talk about compliance with core principles of procurement regulation.

15:14 Um,

15:15 and even in an emergency,

15:16 of course,

15:17 we can

15:18 follow procurement rules.

15:19 The key is really to ensure compliance with

15:22 the procurement legislation that is in force,

15:24 and that's a question of how good that procurement legislation is.

15:28 But really,

15:28 the,

15:29 the first thing we should be doing is trying to apply

15:31 competitive procedures,

15:33 either the most transparent,

15:34 the most competitive procedures like open,

15:36 for example,

15:36 an open or a public

15:38 tender,

15:38 whenever that's possible,

15:40 um,

15:40 especially when the timelines can be met.

15:44 Because not every procurement in an emergency requires immediate action.

15:48 You may have to do something

15:50 that day or in the next few weeks.

15:52 But as we've seen from this pandemic,

15:54 we've been at it already sort of the best part of 9 months and it's going to carry on.

15:58 That's not an emergency in the sense of having to do something immediately,

16:02 that's a,

16:03 a longer term solution.

16:04 So in terms of procurement,

16:06 we have time

16:07 to plan and to do

16:09 things that we need to do.

16:10 It's not,

16:11 everything doesn't have to be done.

16:13 Uh,

16:13 immediately,

16:14 so I think there is,

16:15 uh,

16:15 an argument for saying that we should be able to apply

16:18 the procurement rules,

16:20 um,

16:21 as they are.

16:22 Um,

16:22 of course,

16:23 there are some problems that are built into procurement procedures.

16:28 Um,

16:29 for example,

16:29 and now those are things that perhaps is in

16:31 writing regulations or in encouraging different regulations we're responsible

16:36 for

16:36 placing.

16:37 We've put,

16:37 we've set up those obstacles.

16:39 Things like,

16:40 um,

16:41 waiting for bid securities to be,

16:44 uh,

16:44 to be received from banks and checking those bid securities.

16:48 I know Vina who spoke earlier.

16:50 Um,

16:50 has an issue with bid securities,

16:52 and,

16:52 and I think we all need it,

16:54 we have an issue with bid securities because,

16:56 uh,

16:56 are they really necessary in Europe,

16:58 we don't use them at all.

16:59 I mean,

16:59 when I'm teaching,

17:01 when I'm teaching procurement and I have to talk about bid securities,

17:04 most of my students from here say,

17:05 what are they?

17:06 We don't need them,

17:07 they're not necessary,

17:08 but of course,

17:09 a lot of countries do want them.

17:11 But for our current purposes,

17:12 they simply add delay and they cause a problem

17:16 for applying.

17:17 Um,

17:17 the normal procedures,

17:18 and I'm using the word normal in inverted commas,

17:21 approval mechanisms.

17:23 If you have to follow all of these procedures and get a number of different

17:27 approvals,

17:28 well,

17:28 you know,

17:28 if the people aren't available,

17:29 you're not going to get those approvals,

17:31 and that's a delay,

17:32 and that's built into the regulation

17:34 rather than,

17:35 um,

17:36 a,

17:36 a problem caused by,

17:38 uh,

17:38 the normal procurement,

17:39 um,

17:39 regulation.

17:41 And when we can't use competitive uh tendering,

17:43 when we can't use those,

17:44 those,

17:45 the most uh transparent procedures,

17:47 then the question is going to be

17:49 trying to maximize the use of

17:51 flexibility and speed under

17:53 the legislation and,

17:54 and all

17:55 procurement systems that I've seen do have some

17:58 um procedures there to deal with

18:00 emergency

18:02 situations.

18:02 It's usually some form of single source procurement or direct contracting.

18:06 It doesn't mean you have to go to one.

18:08 Uh,

18:08 bidder,

18:09 you can go to several,

18:10 but it's a direct,

18:11 um,

18:11 link,

18:12 a direct negotiation rather than advertising and,

18:14 and calling people in by invitation.

18:17 And that's quite normally,

18:19 quite normal in emergency situations.

18:21 All legislation does it and all countries need to have them.

18:24 Uh,

18:24 but some procurement systems,

18:26 and of course that's the result of the,

18:28 the approach of the government,

18:30 are so fearful of having direct contracting

18:33 that they make it very difficult and sometimes render it completely ineffective.

18:37 Uh,

18:37 and by that I mean using approval mechanisms,

18:40 checks and balances that are,

18:42 Uh,

18:42 probably,

18:43 uh,

18:43 too burdensome and then undermine totally the possibility of using,

18:48 uh,

18:48 speedy procedures,

18:49 and I think that's something that those responsible

18:51 for drafting legislation need to be aware of.

18:54 It's not,

18:55 it's not,

18:55 um,

18:56 inherent in procurement regulation itself.

18:59 So I think what I'd like to say is we really need to have a,

19:02 a balance of risk

19:03 and

19:04 outcomes

19:05 and that's in general,

19:06 not just in response to COVID.

19:07 I think it's become very obvious

19:09 in the case of COVID,

19:11 but

19:11 um I think in general we need to have the same,

19:14 the same sort of um approach.

19:18 Uh,

19:18 now some of the legal issues that I've been dealing with quite a lot really.

19:23 Uh,

19:23 go get,

19:24 go around the issue for triggering the emergency provisions.

19:27 How,

19:28 how and when can we use

19:30 these different emergency,

19:32 uh,

19:32 provisions?

19:33 In some cases it's a question of having an emergency declaration.

19:37 Uh,

19:38 these,

19:38 um,

19:39 appear in many,

19:40 in many country systems,

19:41 especially those who've

19:43 have,

19:43 have recently reformed their systems.

19:46 But it also

19:47 applies in developed countries like the United States.

19:50 Now,

19:50 in the US there are plenty of

19:52 other provisions which will trigger emergency provisions,

19:55 but there is one,

19:57 which,

19:58 uh,

19:58 which allows certain,

19:59 um,

19:59 payments to be made,

20:01 which is triggered by an emergency declaration.

20:04 The trouble with waiting for an emergency

20:06 declaration is really a question of delay.

20:09 In the United States,

20:10 uh,

20:11 the president happens to be Trump,

20:12 of course,

20:13 but the president waited rather a long time before issuing a declaration.

20:17 His declaration of emergency came 20 days after the

20:20 World Health Organization decided to declare an emergency.

20:24 Not so long you may say,

20:25 but in those countries where you,

20:27 you can

20:28 use shorter time periods in the case of urgency,

20:31 you could easily do a full competitive procedure using accelerated

20:35 timelines within those 20 days.

20:37 So

20:37 I think that's quite a significant delay

20:40 in terms of um declaring an emergency.

20:43 They're very discretionary because they,

20:45 they're often the conditions are not very clear

20:47 in

20:48 the legislation,

20:49 so it's really up to the president or his advisors to say when that should happen.

20:53 And the other problem with the declaration of

20:55 emergency is really the length of validity.

20:58 Um,

20:59 the,

20:59 in the US,

20:59 for example,

21:00 I,

21:00 I,

21:00 I,

21:01 uh,

21:01 the US is not so bad.

21:02 I'm just using an example because in this case,

21:04 it,

21:04 it's quite a,

21:05 a,

21:06 a difficult,

21:06 um,

21:07 or it raises a bit of a problem.

21:09 In the US,

21:10 the declara,

21:10 the president's declaration of emergency lasts for one year,

21:13 it's valid for one year.

21:15 So even if it's,

21:16 if it's um an urgency that some,

21:18 some critical

21:19 um issue that,

21:20 that,

21:21 that led to the declaration,

21:22 it lasts for a year,

21:23 so the urgency's been and gone by the time

21:26 the procurement is done,

21:27 so that really doesn't reflect the need.

21:30 Another method

21:31 um that,

21:32 that is used in different countries depends on the existence of immediacy.

21:37 So,

21:37 um,

21:38 if,

21:38 if there isn't enough time,

21:40 if there is insufficient time to use the competitive

21:43 procedures,

21:43 then that's the time at which you can use the more flexible procedures.

21:47 And in theory that allows

21:49 the procuring entity to take action when it recognizes

21:53 the urgency.

21:55 Um,

21:57 That,

21:57 um,

21:58 so it's based on,

21:58 on the fact that there isn't enough time,

22:00 but there are usually conditions as well.

22:02 So

22:03 conditions that the,

22:04 the,

22:04 um,

22:05 emergency shouldn't have been foreseeable and shouldn't be,

22:08 um,

22:08 the result of any dilatory conduct on the part of the procuring entity.

22:12 And this,

22:13 this is sort of problematic and has been in,

22:15 in,

22:16 in the legislation that I've been looking at.

22:18 Because even if the pandemic wasn't foreseeable,

22:21 and

22:21 the scientists may disagree on that,

22:23 once it's happened,

22:25 the consequences of that pandemic become foreseeable.

22:28 So we know what needs to happen over a period of time,

22:30 it's no longer urgent

22:32 and therefore it might,

22:33 the,

22:34 the procurement might fall outside these definitions of urgency.

22:38 And if there's any delay in addressing dilatory conduct,

22:41 so for example,

22:43 uh sorry,

22:43 any delay in taking action if there is dilatory conduct,

22:46 so for example,

22:47 there wasn't budget available or people couldn't agree

22:49 on what to do or we were waiting for approval,

22:52 that takes away the foresee the unforeseeability and it's no longer urgent.

22:56 So

22:57 the whole

22:58 trigger for using urgent and flexible procedures disappears.

23:02 And there are of course then

23:04 definitions of urgency,

23:06 we can have different degrees,

23:07 so they say if it's very urgent,

23:08 you can do it immediately.

23:10 If it's less urgent but still urgent,

23:12 then you can do

23:13 a a little bit longer.

23:14 You don't do direct,

23:15 it's direct solicitation,

23:16 you take a little bit more time and it's almost like a competitive procedure.

23:21 Um,

23:21 but that causes a problem,

23:22 I think in reality,

23:24 because what

23:25 procuring entities need or procurement officers need when we

23:28 have an urgency is some sort of certainty.

23:30 What can I do at this point in time?

23:32 They don't need,

23:33 um,

23:33 tools of statutory interpretation,

23:35 well,

23:36 guidelines who say this is how you interpret this provision,

23:38 that's,

23:39 no,

23:39 they just need to know what they can do,

23:40 and I think that's,

23:42 that's turned out to be something of,

23:44 um,

23:44 a problem in,

23:46 in practice.

23:48 Now the real issue is always going to be one of,

23:50 of question,

23:51 is always going to be one of time and speed.

23:54 Um,

23:54 now,

23:54 normally,

23:55 the distinction is made,

23:57 uh,

23:57 based on bidding periods.

23:59 There's time for submission of bids.

24:00 So if that's too long,

24:01 um,

24:02 then we're not going to be able to deal with something urgently,

24:04 those need to be shorter.

24:06 But it's not just a question of,

24:08 of,

24:08 of bid submission timing.

24:11 Time can also be lost through lots of other,

24:13 uh,

24:14 provisions.

24:14 So,

24:15 you always have to

24:16 prepare technical specifications.

24:18 I mean,

24:18 you can't get rid of that as a requirement.

24:20 You can't just buy something.

24:22 Um,

24:23 without knowing what you're buying.

24:24 Of course,

24:25 that's exactly what the UK did,

24:27 and,

24:27 you know,

24:28 they turned to a producer of vacuum cleaners to

24:31 produce all of the equipment that they needed,

24:33 Dyson.

24:34 Um,

24:34 so they didn't really know what they were doing,

24:35 and that led to a pretty much a failure in,

24:38 in the procurement.

24:39 But there are other things like the bid securities I've mentioned,

24:41 you have to have you,

24:42 you need clarifications maybe

24:44 um there are bid opening procedures which are always get in the way.

24:48 There's time for evaluation,

24:49 award procedures and approvals.

24:51 All of these things cause

24:52 a,

24:52 a delay and I think that's where

24:55 we need to,

24:55 to,

24:56 that's what we need to look at.

24:57 Um,

24:58 because procurement legislation as it stands is pretty much a blunt instrument to,

25:02 to address these issues.

25:04 In practice,

25:04 what I've seen in most countries,

25:06 and I've helped draft some of this a special guidance to,

25:09 um,

25:09 tell procuring entities what it is they can and can't do.

25:13 Um,

25:14 now

25:15 that's because maybe the,

25:16 the legislation isn't.

25:18 Isn't clear enough,

25:19 but it's legislation,

25:20 we don't write every detail in legislation,

25:23 so you need,

25:24 you need somehow to have some capacity to understand all of this,

25:27 so it may be a question of capacity,

25:29 of course,

25:30 but this guidance has been necessary to spell out the core principles.

25:34 Now in some cases,

25:35 that's indicated shortcomings in the law,

25:38 and those,

25:38 like I've mentioned,

25:39 description of urgency and that of course needs to be

25:42 amended for the future.

25:44 But dealing with all of these guidelines,

25:46 the irony of that,

25:46 all of that really is that by the time the

25:48 guidance has been prepared and gone through several iterations,

25:51 the emergency is over.

25:53 I don't mean the pandemic,

25:54 I mean the urgent

25:55 element of the pandemic,

25:57 that's finished and,

25:58 and really there's no,

25:59 uh,

26:00 you know,

26:00 there's nothing left to do.

26:02 So just finally,

26:03 I,

26:03 I think perhaps I should say we really need to prepare for the next time

26:07 in the hope of course that there's never going to be a next time,

26:09 or at least not quite like this.

26:11 So I'd suggest that we start looking at having

26:13 frameworks in place to deal with predictable emergencies,

26:16 and as I said,

26:17 scientists will say that

26:19 this was foreseeable,

26:20 we were ill prepared and we should have been

26:22 ready for it,

26:23 even if we didn't believe that,

26:24 so we need to get ready for more.

26:26 We need to clarify

26:28 the laws to trigger flexible procedures quickly and simply,

26:31 so

26:32 if it's a declaration,

26:33 let's get that right,

26:34 if it's a definition,

26:35 let's get that right.

26:36 I think we should remove obstacles which do not add value,

26:40 so bid securities,

26:41 why do we need those?

26:42 We can at least replace them by

26:44 bid securing declarations,

26:46 which

26:47 also take time but are much quicker and,

26:48 and simpler and cheaper.

26:51 Maybe we should consider getting rid of approvals where they don't add value,

26:54 so we could strengthen

26:55 uh complaint mechanism to deal with cases where there are problems.

27:00 Maybe we need a manual in place rather than guidance,

27:03 but constant manuals so that we can have lessons learned.

27:07 And I think we probably need to be ready,

27:09 more ready to address

27:10 market failures,

27:12 and procurement bodies are really not renowned for doing this.

27:15 So we should be applying competition rules,

27:17 we should be applying anti-corruption provisions,

27:19 so fraudulent conduct,

27:22 abusive market behavior and profiteering,

27:24 also something that came up in the

27:26 National Audit Office report that I mentioned.

27:29 And as VA said at the very beginning,

27:31 Uh,

27:32 maybe we should look more at cooperative procurement so that

27:35 countries are not working in isolation.

27:37 This might reduce abusive market behavior and ultimately

27:41 might ensure a bit more equity in the distribution of the products and services

27:46 that we need.

27:47 Now,

27:47 there's much more,

27:48 of course,

27:48 to discuss,

27:49 um,

27:50 and I'm looking forward very much to the presentations to come,

27:53 but I really need to stop at this point because I think I've gone over time.

27:56 Thank you very much.

27:59 Well,

27:59 uh,

28:00 thank you,

28:00 thank you very much,

28:01 Mr.

28:01 Tere for your insight.

28:03 Interesting view on procurement driven by immediacy and

28:06 also considering the situation caused by the pandemic,

28:10 more of a question of market failure,

28:12 and I'm pretty sure our

28:14 legal colleague Belita is very happy with your initial

28:16 remarks on how this is not a legal issue,

28:19 so.

28:21 Now we can move

28:23 to our

28:25 second speaker,

28:26 Mrs.

28:26 Carrie Klotz.

28:27 We invite her to share her take on

28:30 open procurement data to analyze and share information

28:33 to predict and manage critical supply chain.

28:36 Ms.

28:36 Klotz,

28:37 the floor is yours.

28:42 Great.

28:42 Thank you

28:43 so much and,

28:44 and thanks so much for inviting me,

28:46 um,

28:46 Nagaraji and Hiba in particular.

28:48 Um,

28:48 I'm really excited to be here with some familiar faces and to,

28:52 to meet some new,

28:53 um,

28:53 folks as well.

28:55 Um,

28:55 and I think mostly I'm,

28:56 I'm impressed to see that there's still this much interest in this topic even

29:00 six months in,

29:01 unfortunately,

29:01 and,

29:02 and hopefully the end is in sight.

29:03 Um,

29:04 but I think as we know now more than ever,

29:06 procurement is key to both an effective crisis response,

29:09 of course,

29:10 perhaps more importantly,

29:11 an effective recovery.

29:12 Um,

29:13 so when the COVID-19 pandemic hit earlier this year,

29:15 it didn't take long to realize,

29:17 and Peter pointed out some of this,

29:19 um,

29:19 how unprepared most procurement systems were to deal with the emergency.

29:23 Um,

29:23 and of course,

29:24 significant concerns were raised and continue to

29:26 be about the potential for inefficiency,

29:28 ineffectiveness,

29:29 and abuse during the pandemic response.

29:32 As we know all too well now,

29:34 COVID put the world in crisis mode or chaos as HIPA mentioned.

29:37 Um,

29:38 and governments in all levels were mobilized to purchase urgently needed

29:41 medical equipment and other supplies and services to fight the virus.

29:44 Um,

29:45 we know now that governments spent at least $100 billion on

29:47 COVID contracts in just the 1st 4 months of the pandemic,

29:50 and that continues to go.

29:52 Um,

29:53 I can cue the slides,

29:54 no worries.

29:55 Um,

29:55 unfortunately,

29:56 in many cases,

29:57 we also saw a Hunger Games scenario,

29:58 which is chaos,

30:00 uh,

30:00 where governments were directly competing against each other for limited amounts

30:04 of equipment and supplies.

30:05 Not to mention that procurement agencies might not have known.

30:08 What they needed to buy in the first place.

30:10 And,

30:11 of course,

30:11 the bad actors taking advantage of the chaos to

30:13 enrich themselves at the expense of medical patients.

30:16 And that's what this slide is getting at.

30:18 Um,

30:19 so COVID really put procurement into the spotlight like never before.

30:23 And we've all seen the stream of media reports of COVID gone wrong,

30:26 and especially this report that Peter mentioned that

30:28 came out yesterday in the UK that is,

30:30 um,

30:31 Uh,

30:31 not,

30:32 not so,

30:33 not so positive.

30:34 Um,

30:34 but across the world,

30:35 millions upon millions of dollars have

30:37 been squandered on questionable purchases.

30:40 Um,

30:40 we've seen ventilators that never arrived in Israel,

30:42 counterfeit masks and test tubes that turned out to be soda bottles in the US,

30:46 and this is an example of a raspberry farm that

30:48 scored a $6 million contract to supply ventilators in Bosnia.

30:53 Beyond that,

30:53 there's also the devastating economic impact of the COVID pandemic,

30:56 which we all know too well.

30:58 Um,

30:58 the bank itself,

30:59 I think we know,

31:00 has warned that the current crisis could undo decades of global poverty reduction.

31:05 So the huge economic economy that's smarter,

31:07 more efficient government spending is more important than ever before.

31:11 So what can we do?

31:13 As the IMF managing director,

31:14 Georgieva said,

31:15 back at the very beginning of the crisis,

31:17 governments need to spend more money

31:19 more quickly,

31:20 but keep the receipts.

31:22 At the Open Contracting Partnership,

31:24 we couldn't agree more.

31:25 For those who don't know us,

31:26 we spun out of the bank's governance global practice about 5 years ago,

31:30 and we now work with governments around the world and their stakeholders

31:33 to implement data-driven reform projects

31:36 to improve the effectiveness and fairness of government contracting,

31:39 and we often work in coordination with bank projects.

31:42 At its core,

31:43 open contracting is about publishing and using.

31:46 Carrie,

31:47 sorry to interrupt.

31:48 I would kindly ask you to speak a little bit slower

31:51 so our interpreters can,

31:52 uh,

31:53 do their work while online.

31:54 Thank you.

31:57 Sure.

31:58 Of course.

32:01 So open contracting is about publishing

32:03 and using

32:04 open,

32:05 accessible,

32:06 timely information on government contracting

32:09 to engage citizens and business in identifying and fixing problems.

32:13 We look at the entire chain of public contracting,

32:17 including planning,

32:18 tendering,

32:18 awards,

32:19 and implementation

32:21 through to the delivery.

32:23 Our work with partners around the world has shown that open

32:26 contracting can make a big difference when it's done right.

32:30 By that,

32:30 I mean beyond legal frameworks alone.

32:32 As Peter rightly mentioned,

32:34 the high-putty,

32:35 open data that's accessible.

32:37 Businesses and citizens need to have a voice and government has an ear to listen.

32:41 Open contracting has led to significant savings

32:44 and improved citizens

32:45 services,

32:46 and ultimately rebuilt trust.

32:49 So what we've seen over the past few months

32:51 is countries doing just this have been able to respond better to the crisis.

32:55 The pandemic has actually demonstrated the vision of open contracting.

32:59 And we've seen clearly that countries investing in open contracting data

33:03 and working with civil society and business for planning and monitoring

33:06 have seen better results.

33:08 Then the next slide.

33:11 Um,

33:14 Perhaps most importantly,

33:15 in order to prepare better in the long term

33:17 for the recovery we all hope is coming soon.

33:20 We've developed some recommendations based on our work

33:22 with partners over the past several months.

33:25 First,

33:26 on policy.

33:27 Encourage our client countries to ensure open emergency procurement

33:31 that makes data and information

33:33 awards public.

33:35 Help to make emergency procedures and procurement

33:38 transparent and public and clearly justified,

33:41 as Peter highlighted well.

33:43 2,

33:44 coordination and oversight.

33:47 Centralized and coordinated procurement

33:49 can help with quick and better planning.

33:52 Help your client countries set goals and priorities,

33:54 and consolidate emergency committees

33:57 for quick decision making.

34:00 3.

34:01 Disclosure and open data.

34:04 We can recommend that client governments publish and use

34:07 open data on emergency procurement

34:09 in order to analyze and share information,

34:12 to predict demand,

34:14 understand the market,

34:15 and manage critical health supply chains.

34:19 It's key to ensure safeguards and full

34:21 transparency in bank-funded projects as well,

34:24 to be able to track and monitor procurement,

34:26 including related to the rapid credit facilities that are ongoing.

34:29 We're happy to provide advice and guidance on what this could look like

34:33 with a reminder that you can still buy fast

34:35 but keep the receipts.

34:38 For those client countries that are still working toward digital procurement,

34:41 disclosing information to the extent possible

34:44 is still crucial for building trust with citizens.

34:48 Number 4,

34:49 in terms of red flags analysis and supplier insights,

34:52 especially given the huge supply shock during the emergency,

34:56 there's a clear need to help buyers find suppliers,

34:59 but also a need to do due diligence on them

35:01 and understand track records,

35:03 as many of the recent news stories have made apparent,

35:06 including some that Peter mentioned

35:07 and our raspberry farmers from earlier.

35:10 Last but not least,

35:12 collaboration with civil society,

35:14 journalists,

35:15 and other stakeholders for monitoring is key.

35:18 We can encourage and support partnerships among civil society,

35:21 audit institutions,

35:23 media,

35:24 and procurement authorities

35:26 to monitor effective spending and delivery of goods and services.

35:30 In many countries,

35:31 such monitoring and advocacy has already led to more transparency,

35:35 accountability,

35:35 and effectiveness,

35:36 as we'll see now.

35:40 We're working in various capacities with all the countries

35:42 that we'll hear from on our panel to come.

35:45 Uh,

35:45 so I'll give a cour demon of a couple of additional examples from Paraguay,

35:49 Moldova,

35:50 and Nigeria,

35:51 which are different ways

35:52 how open contracting allowed them to better plan,

35:55 buy,

35:55 and deliver

35:56 essential COVID contracts.

35:59 In Paraguay,

35:59 as you see here,

36:00 the government's procurement agency wanted to ensure

36:03 transparency of its COVID-19 emergency purchases.

36:07 So we worked with our partners there to

36:09 ensure accurate identification and publication of this information

36:13 within 10 days of purchase.

36:15 Data included the buyers,

36:17 prices,

36:18 suppliers,

36:19 and information about the items being purchased,

36:22 as well as their delivery.

36:25 They've also published a searchable data set

36:27 of COVID-19 procurement as you see here.

36:29 And the open contracting approach is also enabling more agile procurement

36:33 as they were able to create a registry of suppliers of emergency items

36:37 that makes it easier for government agencies to act or respond

36:41 and frameworks to make it easier

36:43 to procure these items.

36:45 They've also worked to ensure that

36:46 the public could easily monitor COVID-19 purchases

36:50 by establishing a dedicated searchable webpage,

36:52 as well as a dashboard and mobile app

36:55 that sends notifications of newly awarded contracts.

36:58 We've already seen users of this data include government itself,

37:01 business,

37:02 civil society,

37:03 academia,

37:05 and media

37:06 who have actually been reporting on irregular procurements,

37:08 including a case where volumes of tonic water

37:11 were purchased at 5 times the normal price

37:14 as an alleged COVID-19 treatment.

37:16 This led the procurement authority to introduce new rules

37:19 for reference prices on emergency purchase to be published,

37:22 which hopefully will avoid other inflated emergency procurements

37:26 now and in the future.

37:29 Over the oceans in Moldova,

37:30 Positive Initiative is the largest patient rights advocacy group in the country.

37:34 It's also part of our Lyft Impact Accelerator program.

37:38 There,

37:38 they built a coalition of 30 nonprofit and governmental organizations

37:42 that in just a few weeks,

37:44 launched a public procurement platform

37:46 that displays detailed information about all government contracts

37:49 for supplies and services to fight COVID.

37:52 This has benefited a range of stakeholders

37:55 as we've seen journalists running investigations,

37:58 civil society tracking spending,

38:00 procuring entities using the tools for better planning,

38:03 and suppliers conducting market analysis.

38:07 And down in Nigeria,

38:08 related to the government's commitment to

38:10 the IMF's rapid Credit facility funding,

38:13 the procurement Authority has begun publishing information on COVID procurement

38:16 through the Nigerian Open Contracting portal.

38:19 This enabled a coalition of civil society organizations

38:22 to use this data for advocacy and monitoring.

38:25 The information is only available in PDF for the time being,

38:28 but it's already led to an increase in coverage of information published,

38:32 and discussions are ongoing to publish this information in a more usable

38:36 and open format

38:37 for COVID procurement and beyond.

38:39 And this includes looking toward the new bank-supported EGP system.

38:44 In the slide here,

38:45 um,

38:46 you see,

38:47 actually right now,

38:48 uh,

38:48 is,

38:49 is happening the launch of our recent action research project

38:52 where we worked with teams from 12 countries around the world

38:55 to analyze emergency procurement and

38:57 make recommendations to improve efficiency,

38:59 effectiveness,

39:00 fairness,

39:01 integrity,

39:02 and equity.

39:03 There were a range of challenges that are highlighted on this slide,

39:06 but one recurring theme that echoes many of the lessons previously cited,

39:10 as well as our upcoming

39:12 comparative legal research that we're doing with

39:13 Thomson Reuter Foundation's Trust Law Project.

39:16 But we've seen that good policies with solid legal frameworks

39:19 and especially standardized,

39:21 timely,

39:22 good quality data publication

39:24 has enabled the best analysis.

39:27 We have a couple of upcoming um

39:30 sets of research that will announce a call for proposals on.

39:33 Uh,

39:33 the first one,

39:34 especially looking at how open contracting approaches can support effective

39:37 and efficient spending during the recovery

39:40 from the impacts of COVID-19.

39:42 Um,

39:42 we'll also be doing a bit of research looking specifically at,

39:45 uh,

39:45 the commitments around the IMF rapid Credit Facility,

39:48 um,

39:48 and the pledges that countries have made to

39:51 Published tracks.

39:52 We'd love to collaborate with you all on that.

39:55 The next slide,

39:57 you can see

39:58 how we've worked over the past months to write up a series of best practices,

40:02 as well as developing resources to support

40:04 country partners to respond to the pandemic.

40:07 Here you see our guide to

40:08 collecting and publishing COVID-19 procurement information,

40:11 which we know is already being used by our partners in Argentina,

40:15 Ecuador,

40:16 South Africa,

40:16 and.

40:18 The COVID-19 page on our website links to this and many additional

40:21 resources that can be useful to you and your client countries.

40:25 From mapping COVID-19 data to the OCDS

40:28 to tips for publishing relevant information,

40:30 to red flags indicators,

40:32 to supporting use,

40:33 analysis and monitoring of data.

40:36 We also always offer our OCDS helpdesk,

40:39 a free of charge bespoke service for

40:41 those working to publish open contracting data.

40:44 And we're especially excited about a new tool that

40:46 will launch next month with Transparency International's Health Initiative,

40:50 our COVID procurement Explorer,

40:52 which will be a platform to collect

40:54 COVID-19 procurement information,

40:56 as well as lessons learned and best practices from all around the world.

41:00 We're piloting initially with 5 countries from Latan,

41:03 ECA,

41:03 and Africa,

41:04 but we're keen to work with others to expand coverage far and beyond,

41:07 far and wide beyond us.

41:10 And looking beyond the crisis response itself and toward the eventual recovery,

41:14 we're especially excited about the vaccines that they're promising this week.

41:18 As the vaccine comes closer to reality,

41:21 we'll be working with several of our partners

41:22 to develop a COVID vaccine procurement tracker.

41:25 This would include data on budgets,

41:28 info about how the vaccines will be purchased and processes followed,

41:31 and we also hope to support our partners on

41:33 delivery and quality of the vaccines as well,

41:36 looking toward equitable distribution.

41:38 We know that challenges will continue during the recovery phase,

41:41 and we're especially focused on the crucial sectors of health,

41:44 infrastructure,

41:45 and small and medium-sized prizes.

41:48 So we know many governments focus on these areas

41:50 as the crisis transitions from emergency response to longer-term recovery.

41:55 The bank and international partners can of course help support governments to

41:59 be set up for success during this next phase as well.

42:02 Again,

42:02 the key things to consider in an effective emergency response

42:05 and recovery

42:07 are the right policies that allow for transparency,

42:10 good quality,

42:11 accessible open data,

42:13 coordination of demand and response among different actors,

42:16 and data use and monitoring.

42:18 The good news is that you don't have to reinvent the wheel over and over again.

42:22 We have global resources like the Open Contracting Data Standard,

42:25 related tools and methodologies,

42:28 proven tactics and templates for designing reforms,

42:30 as well as change management process to go along with them.

42:33 And other resources created by the open contracting community

42:36 adopted and used by your client.

42:40 One thing that's for sure,

42:42 the fiscal impact of COVID-19 will be unprecedented.

42:46 We want to make the most of what limited public money there is

42:49 to effectively fight the virus,

42:50 protect our populations,

42:52 and rebuild our economies.

42:53 We've seen that open data and transparency need to be at the heart of the response,

42:57 as well as the plans to build back better.

43:00 And if anyone's interested in how to get started,

43:02 please don't hesitate to get in touch.

43:04 We're planning a follow-up events,

43:05 um,

43:06 hopefully next month to speak more about systemic forums to help the longer term,

43:09 looking toward the recovery too.

43:11 I'll stop there.

43:12 Thank you.

43:14 Well,

43:15 many thanks Carrie,

43:15 for sharing your perspective on the importance of clear and transparent data that

43:20 resonates so much with our work

43:22 and indeed the emergency put procurement in,

43:24 in the spotlight as never before.

43:26 I'm certain that the presentation from our keynote

43:29 speaker provoked questions and reaction from our audience.

43:32 I see a lot of questions coming throughout TED,

43:35 and I will,

43:36 I will encourage our audience to please,

43:38 uh,

43:39 continue with,

43:40 uh,

43:40 placing your questions,

43:41 your comments in the TED in the end of the session.

43:44 We will give a voice to all of you.

43:46 Now,

43:47 uh,

43:47 we would like to open the floor to

43:48 our panelists and we listen country's firsthand experience.

43:53 To all of our panelists,

43:55 we would like to hear your views

43:57 uh on how being in the middle of the pandemic,

44:00 uh.

44:02 Affected your work?

44:03 How is your experience with uh procurement under state

44:06 of emergency and with what all what it entails?

44:10 Can you please

44:11 share with us today

44:12 your country readiness to conduct,

44:14 to conduct emergency procurement,

44:16 available rules and regulation,

44:18 practices in place,

44:20 instruments or electronic platforms?

44:23 What kind of measures were taken to respond to any policy or procedure gap.

44:28 And finally,

44:28 please share with us what worked well

44:31 and what needed improvement or kind of a lesson learned.

44:34 We will hear from each of the countries like a 10 minute brief discussion,

44:38 and we will start

44:39 with the experience of France that Ms.

44:42 Ily will kindly share with us.

44:44 Ms.

44:44 Ili,

44:45 the floor is yours.

44:57 Miss

45:08 Can you hear us?

45:11 With mode.

45:13 Yes,

45:13 I can hear you.

45:14 Can you hear me?

45:18 Can you hear me?

45:22 Great.

45:25 Hello,

45:26 everyone.

45:27 Thank you.

45:29 Very much for giving me the floor.

45:31 I am very pleased to speak about

45:34 this topic with you today.

45:38 My

45:39 name is Claire Ely.

45:41 I am a legal expert on

45:44 Public procurement for the Ministry of the Economy and Finance.

45:48 If I'm speaking too fast,

45:50 please do let me know.

45:53 So that the interpreters can follow along.

45:57 Now,

45:58 in the case of France.

46:02 We were

46:03 very much affected by COVID,

46:05 as you know.

46:09 About 46,000 people have died to date,

46:12 unfortunately.

46:15 Starting in March of this year,

46:17 we had to take very drastic measures to fight COVID.

46:22 The main problem

46:26 That we encountered.

46:30 Were problems related to supply.

46:34 At the beginning of the pandemic.

46:39 And even before in February and going into March.

46:44 We saw situations.

46:48 That were extremely surprising,

46:50 especially when we looked at the

46:52 markets and the value chains.

47:01 We saw

47:03 a lot of cases where buyers.

47:06 Bought up

47:08 Masks or.

47:11 Medicine and the goods weren't actually

47:15 delivered.

47:17 Because

47:18 when.

47:19 The goods arrived at the airport.

47:21 Other countries,

47:22 particularly the United States,

47:24 rushed in

47:25 and took.

47:28 Those masks.

47:29 And originally,

47:29 those masks were supposed to go to some of the French overseas territories.

47:35 So all of that to say where that we were in a situation

47:39 where it was very difficult to

47:43 uphold our principles.

47:45 And sometimes it was hard not to play that kind of game.

47:51 So,

47:57 We wanted to.

47:59 Get those goods back from the US government

48:02 because we needed those materials as well.

48:07 I'll also note here that

48:09 France has very strict regulations on public procurement.

48:15 Of course,

48:16 European law also applies to us,

48:19 but we go above and beyond European thresholds for procurement in France.

48:28 And our

48:29 public procurement principles are very strict.

48:34 Uh,

48:34 we emphasize transparency

48:36 and

48:38 that

48:38 is the case for all situations,

48:41 all cases of procurement.

48:44 But that made things very complicated for us.

48:49 Again,

48:49 as I said,

48:50 it was very hard not to,

48:52 to get into that game of

48:54 paying more in order to get the merchandise or equipment that we needed.

48:59 And we also know that some companies

49:02 took advantage of that situation.

49:07 So what did France do?

49:09 France had to urgently adapt some of its procurement rules.

49:16 The most important thing for us,

49:18 which I would note here.

49:22 is for us to strike a balance.

49:26 Between

49:29 Flexibility

49:31 on the one hand and upholding and applying our principles on the other hand.

49:36 So we had to adapt our regulations.

49:41 A

49:44 Regulation was passed in March to make those changes.

49:48 I'll summarize them here.

49:51 Our main goal was to say that.

49:54 This is only a temporary

49:56 reform or modification of our laws.

49:59 And

50:00 buyers

50:01 could enjoy some flexibility,

50:03 but not in a systematic manner,

50:05 not in every single case necessarily.

50:08 So,

50:09 if flexibility was offered to a buyer,

50:13 The buyer couldn't come back later and say.

50:18 Well,

50:20 This contract holds for the duration of the emergency or the pandemic.

50:27 The buyer would have to.

50:30 Make sure that the flexibility would continue to apply

50:34 to each contract that he was engaged in.

50:43 So it was very important for us,

50:45 I'm

50:46 repeating this again,

50:47 to make sure

50:49 that we were not

50:51 contravening our own public procurement laws.

50:53 We needed to make sure that public procurement law

50:57 was

50:59 A way to protect us in the situation.

51:03 And not the contrary.

51:06 Starting in March of this year,

51:08 France

51:09 took a few different measures

51:12 to

51:13 facilitate the situation for buyers.

51:16 And also to support

51:18 various businesses and companies during the crisis.

51:22 So to help

51:23 buyers,

51:24 we

51:26 Offered a few

51:29 new arrangements.

51:31 Particularly,

51:32 we decided to.

51:35 Modify.

51:37 Uh,

51:37 the deadlines for receiving

51:41 bids.

51:47 What we decided to do.

51:49 Was have a longer period during which we could receive

51:54 these submissions.

51:57 When you try to

51:59 do something quickly,

52:00 often the deadlines are very tight and very short,

52:03 and we weren't getting any responses because those deadlines were too tight.

52:07 And so we'd have to start the whole process over again.

52:10 And a lot of companies,

52:12 particularly French companies,

52:13 came back to us and said,

52:16 It would make things a lot easier

52:18 if we had longer time frames to respond to these calls for tender.

52:24 That would give everyone more of an opportunity

52:26 to prepare themselves and send in a bid.

52:28 And that really was a way to

52:31 address the

52:33 emergency was to allow for a longer submission period.

52:43 Again,

52:43 it was up to the buyer.

52:47 To

52:50 Send in the.

52:52 The bid

53:01 Now,

53:03 We also looked at other.

53:07 Uh,

53:07 instances of procurement.

53:12 We

53:13 Wanted

53:16 To continue to have open

53:19 contracts as much as possible.

53:24 But we did allow for

53:26 negotiations to take place

53:28 by video conference even though that wasn't something

53:31 that was originally provided for in the law.

53:34 There was enough flexibility for those conversations to take place over

53:39 video conference.

53:44 We also

53:46 decided to

53:48 cancel some of the site visits that would normally take place

53:51 for certain types of procurement

53:54 contracts.

53:55 So,

53:55 those were

53:57 specific clauses or terms that we introduced.

54:06 We also

54:07 established a specific time frame during which these

54:11 legal provisions would apply.

54:16 So we made some changes.

54:22 But we didn't want that to affect

54:24 how we processed all of the bids.

54:28 So even though we did change some of the parameters,

54:31 we wanted to make sure.

54:38 That we were

54:39 not excluding.

54:43 Suppliers from

54:45 the.

54:46 Bidding process.

54:51 So,

54:54 We

54:55 were able to extend some of our contracts.

55:00 Contracts that were already

55:02 uh signed.

55:06 And so some

55:07 buyers had the option of extending their contracts by one additional month.

55:16 But they couldn't go beyond a year-long extension.

55:23 So

55:26 That was the measure that we took and it only applied to

55:31 certain contracts that were signed.

55:38 So

55:40 If

55:41 a.

55:43 Buyer

55:44 had a contract that would expire

55:47 during COVID.

55:53 What we decided to do was to allow that buyer to extend the contract

55:59 for a certain period of time

56:02 until we were able to

56:04 uh launch

56:05 a new uh bidding process.

56:08 So,

56:08 again,

56:08 we weren't trying to eliminate any competition,

56:11 we were just trying to make sure that we were

56:17 Able to continue with certain contracts,

56:19 but these were limited cases.

56:21 They weren't.

56:24 Really going against the main principles that we have in place for

56:28 our.

56:29 Contracts.

56:31 Some of these measures were taken to

56:34 make things just a little bit easier for

56:38 The uh

56:39 bidders and our buyers.

56:46 In some

56:50 In some instances we were.

56:54 Able to remove certain

56:56 uh clauses that would specify

56:59 uh what uh suppliers could be used as well.

57:03 There were exclusivity clauses that we had in the past and some of these were

57:07 slightly modified.

57:13 We also saw that public procurement was a way to protect companies

57:20 that found themselves in very complicated situations during

57:24 uh this emergency period and protecting companies

57:28 also means

57:31 Protecting government money.

57:35 Because

57:37 No one wants to reduce,

57:39 uh,

57:39 competition

57:41 or see competition reduced because

57:43 companies are going bankrupt.

57:48 In some instances.

57:51 We

57:53 have uh sanctions attached to contracts.

57:56 If,

57:57 for instance,

57:57 the company does not uphold all of its obligations.

58:01 But during the state of emergency,

58:05 Uh,

58:05 some of those were.

58:09 Uh,

58:10 adjusted,

58:10 so we might have extended the execution period.

58:17 If,

58:17 for instance,

58:18 the.

58:19 The

58:20 contractor wasn't able to

58:23 execute the contract in the original time frame due to the pandemic.

58:34 We also.

58:40 Asked or allowed for buyers to show that.

58:45 They weren't able to execute the contract,

58:47 so they would have to provide some kind of proof or justification,

58:51 um.

58:54 Provide proof,

58:55 in other words,

58:56 that they were in a very difficult situation and

58:59 that would justify the extension of the execution period

59:03 or implementation period.

59:09 We also worked with a

59:12 range of companies and we.

59:15 Also,

59:17 Allowed

59:19 Buyers to.

59:22 Provide an advance at the beginning of the contract.

59:26 In order to

59:31 Not

59:32 give priority only to companies that have a lot of cash or a lot of cash flow.

59:42 So this

59:44 Uh,

59:45 helped out a lot of the companies that we worked with.

59:49 The museum that is not.

59:52 In the same way,

59:52 we also have set out a number of denunciation

59:56 measures

59:57 and in this case,

59:58 the buyer in uh had to um

1:00:02 Winning on the contract and we had to

1:00:05 uh compensate those companies.

1:00:08 That were actually uh excluded from the possibility of contracting

1:00:13 and uh bidding.

1:00:15 So I will stop there and uh just about the uh emergency arrangements that we adopted,

1:00:21 of course,

1:00:21 in the emergency uh situation,

1:00:23 which is,

1:00:24 is still one,

1:00:25 it is still,

1:00:26 uh,

1:00:26 this pandemic is still here and we are still

1:00:28 in a state of emergency.

1:00:33 I wanted to

1:00:34 emphasize.

1:00:37 The fact

1:00:38 that the French Ministry of Economy and Finance uh decided it would be crucial

1:00:44 to

1:00:46 really stick

1:00:47 to the guiding principles of public procurement in France

1:00:52 where

1:00:53 uh bidders are uh dealt with in a spirit of

1:00:56 transparency and openness and in a spirit of competitiveness.

1:01:01 We realized also

1:01:03 That's when we,

1:01:03 uh,

1:01:04 were out of the very first urgent emergency

1:01:08 situation that a number of these principles actually

1:01:10 were not as effective as all that or efficient as all that

1:01:13 and of course the fact that,

1:01:15 uh,

1:01:15 there was an exclusiveness was not so,

1:01:18 uh,

1:01:18 efficient and a number of companies

1:01:21 in uh

1:01:22 uh France who were asking not necessarily

1:01:24 for that but at least to have the possibility of

1:01:27 bidding and responding more effectively and efficiently to the market.

1:01:32 And uh reacting in this way,

1:01:34 and uh and,

1:01:36 and not really just sort of evolving in the margins.

1:01:38 Now,

1:01:38 I hope this presentation was clear,

1:01:40 and of course,

1:01:41 if you have any questions,

1:01:42 I'd be happy to answer them.

1:01:46 Very

1:01:47 insightful and it was particularly interesting the,

1:01:50 the special attention that you've provided to the

1:01:52 uh to the private companies.

1:01:54 It's sometimes we,

1:01:55 it is bypassed and it is very important that to

1:01:58 uh emphasize that.

1:01:59 Now we are moving to our next,

1:02:01 next country,

1:02:02 the panelist from Ecuador,

1:02:04 another country that unfortunately was hit hard by the pandemic.

1:02:07 Ms.

1:02:07 Paes,

1:02:08 the floor is yours.

1:02:35 Miss Bass,

1:02:36 you're muted.

1:02:46 Can you hear us.

1:02:49 OK,

1:02:49 now we have you.

1:02:50 Thank you.

1:02:53 Can you hear me now?

1:02:55 Yes.

1:02:57 Very well.

1:02:58 Thank you very much.

1:02:59 First of all,

1:02:59 I would like to thank you all for the invitation.

1:03:02 It has been very important

1:03:05 to hear the concept so far in terms of public

1:03:08 procurement and I think that this is an important moment

1:03:13 to think

1:03:14 and uh

1:03:16 implement all of the lessons learned from public contracting,

1:03:21 public procurement,

1:03:22 and the pandemic in the case of Ecuador,

1:03:24 we had a process in which

1:03:27 We declared the health emergency in Ecuador

1:03:32 and we needed to adapt all of the public procurement processes.

1:03:36 What do I mean by that?

1:03:38 We have a technology system

1:03:41 that is

1:03:42 mostly

1:03:43 digital

1:03:45 and uh the public does have access to that system,

1:03:48 but in terms of emergencies,

1:03:52 The process does not necessarily go through procurement,

1:03:57 rather,

1:03:58 it is an exceptional

1:04:01 process where the

1:04:03 Companies

1:04:05 where the entities.

1:04:08 Carry out direct contracting because they are supposed

1:04:12 to solve an immediate problem in addition to transparency

1:04:17 and

1:04:18 the competition.

1:04:20 Opportunity also becomes an important concept in

1:04:25 Under public procurement SE COP,

1:04:28 the public procurement entity carried out several actions.

1:04:32 First,

1:04:33 they created rules,

1:04:35 regulations,

1:04:36 resolutions.

1:04:39 104 and 105.

1:04:44 Asking the contracting parties

1:04:48 to publish on a specific portal.

1:04:52 Their actions and this was a portal for the emergency.

1:04:56 Why did we make this decision?

1:04:58 We made this decision.

1:05:01 Because SERCOP,

1:05:02 that is to say,

1:05:03 the Ecuador's procurement entity

1:05:07 does have

1:05:08 Control over the pre-contract stages and they can carry out oversight

1:05:14 and also implement processes whenever we have some

1:05:18 findings or we see something is wrong.

1:05:21 Clearly,

1:05:22 during an emergency,

1:05:24 everything goes by so fast,

1:05:26 everything happens so fast that it is not possible

1:05:29 to

1:05:30 stop

1:05:31 the processes whenever it is pre-contractual.

1:05:35 So,

1:05:36 first,

1:05:37 We asked them to publish

1:05:39 so we want this to be open data,

1:05:42 so we installed

1:05:44 an open data platform for the emergency so that

1:05:50 At real time,

1:05:51 all of the universities

1:05:53 do in real time all of the universities

1:05:55 and agencies do have access to the information.

1:05:58 So it became a binding rule

1:06:01 and it became

1:06:02 a milestone,

1:06:04 a landmark regulation in Ecuador.

1:06:07 It did have its consequences,

1:06:09 which were those consequences

1:06:11 by having open data,

1:06:13 by turning on the light.

1:06:15 As I

1:06:16 usually say,

1:06:17 we turn on the light in a room that used to be dark,

1:06:21 so we all started to see.

1:06:24 How suppliers

1:06:26 and contracting parties act

1:06:29 and this is important to understand because also

1:06:33 When we provide information,

1:06:35 we need to have maturity,

1:06:36 we need to be

1:06:38 understandable of that information to properly

1:06:42 digest the information and that was one of the decisions made.

1:06:46 On the other hand,

1:06:47 we do need to understand that the demand was

1:06:51 all over the place.

1:06:52 There was an increase of buyers and we had

1:06:56 a decrease in supply,

1:06:59 so for example,

1:07:02 The respirators or the,

1:07:05 or those who produce masks,

1:07:07 they used input from

1:07:10 supplies from China,

1:07:11 but China was out of that

1:07:13 and then prices were very volatile,

1:07:16 we needed to understand the market and I also agree with Peter who already did this,

1:07:21 we need to wonder whether

1:07:23 and understand

1:07:25 what would happen

1:07:26 with the market,

1:07:27 there was market failure.

1:07:29 And another element is that the local supply was insufficient

1:07:34 and not only locally but also internationally it became insufficient.

1:07:39 So it was

1:07:40 all over the place and it was

1:07:42 insufficient and we had a great deal of

1:07:46 uncertainty.

1:07:47 We had asymmetrical information what was going to happen,

1:07:50 how we were going to be

1:07:52 Planning what

1:07:54 the right price

1:07:55 to buy was volatile prices and in addition to that we had

1:08:00 a break

1:08:01 in the global supply chain,

1:08:04 all of these elements.

1:08:09 Lead us

1:08:10 to some,

1:08:11 to

1:08:12 try to analyze all of the details of the market.

1:08:15 So the next option

1:08:17 to have leverage power from

1:08:20 the point of view of the state was to generate centralized purchases,

1:08:25 consolidated purchases,

1:08:27 so that we could have higher bargaining power with the providers,

1:08:31 suppliers,

1:08:33 and also to be able to

1:08:35 create an impact on pricing.

1:08:38 On open data

1:08:39 on that platform that we had

1:08:42 generated,

1:08:43 we also saw how the providers had more information and they were able to

1:08:48 sell to an agency at a certain price but to a different price,

1:08:52 to a Different agency for the same good and on the same day and the same quantity.

1:08:57 Why?

1:08:58 They're playing,

1:08:58 they're playing with the market.

1:09:00 So

1:09:01 we created,

1:09:02 we

1:09:02 enacted regulations

1:09:05 and strategies for purchases and

1:09:08 I think it is very important that every time we had the information,

1:09:13 the actual data,

1:09:14 we were able to

1:09:17 Control concurrently,

1:09:20 so we were limited in our scope of action,

1:09:22 but whenever we had information,

1:09:24 whenever we had,

1:09:26 for example,

1:09:27 communication with the universities,

1:09:29 The public started to act.

1:09:31 They started to

1:09:33 present complaints and those complaints were straight to the office of the

1:09:39 Attorney general and we started to control concurrently.

1:09:43 So that was one of the impacts and also we had the feeling

1:09:47 that there is greater corruption and as you have already presented some examples,

1:09:53 how

1:09:54 the resources were misused.

1:09:58 We also saw that in Ecuador,

1:09:59 the prices of masks.

1:10:03 For example,

1:10:04 that were

1:10:05 in,

1:10:05 in some cases,

1:10:07 soccer fields were

1:10:09 rented because of the pandemic for some activities and also some

1:10:14 agencies that did not have specialization for

1:10:17 the production of masks were actually producing

1:10:20 them,

1:10:21 the market

1:10:21 changed and we have two options.

1:10:24 One,

1:10:24 we need to understand the market,

1:10:25 or two,

1:10:26 we also need to

1:10:28 see what

1:10:30 To the rest of the world.

1:10:31 So this is an industrial reconversion,

1:10:35 we do need to adapt the market,

1:10:37 we need to increase the flexibility and

1:10:41 These are actually questions,

1:10:42 should we do all that?

1:10:44 And

1:10:45 another important

1:10:47 takeaway in the case of Ecuador was that

1:10:52 Procurement during the emergencies

1:10:57 were important but when we opened up the data,

1:11:00 since they were out there for the public,

1:11:03 the individuals from the contracting

1:11:06 agencies

1:11:07 started to be afraid because they were going to be scrutinized by the public,

1:11:12 so we needed to develop manuals training online.

1:11:16 And uh during the emergency,

1:11:18 we also trained the contracting agencies for 24,000 public servants

1:11:26 so that they can act during the emergencies without making mistakes.

1:11:29 This was good.

1:11:31 It was good

1:11:32 for them to think twice

1:11:35 before buying something and also

1:11:37 for them to get trained.

1:11:43 In this regard,

1:11:44 we also generated information which is necessary for decision making.

1:11:49 We also created an open platform,

1:11:52 open data.

1:11:57 So

1:11:58 CoraPublicas.

1:11:59 EC and at this point we have had 200 million procurements during the emergency

1:12:05 that have led to 9

1:12:08 to the

1:12:10 To the participation of 911 agencies and we

1:12:14 do have the ranking throughout the areas,

1:12:16 the departments,

1:12:18 the agencies.

1:12:19 What was the result?

1:12:21 This

1:12:22 improved the information with the populations or COP got adapted

1:12:27 to the

1:12:29 To this open data

1:12:30 and we also have

1:12:34 this ISO for quality.

1:12:35 And also against bribery,

1:12:38 and in this case,

1:12:39 all of the institutional

1:12:41 processes are ready for an emergency,

1:12:44 we also made all of these processes transparent,

1:12:47 transparent,

1:12:48 we allowed for oversight,

1:12:50 we allowed for the communication of all of the information

1:12:54 with um the citizens and we also allowed to communicate

1:12:58 better information on the contracting entities and the

1:13:03 Parties that are acting in this process,

1:13:05 the dynamic part is what did we learn from all of this process,

1:13:09 we,

1:13:10 what are the lessons learned?

1:13:12 First,

1:13:13 we learned that the institutions need to be solid.

1:13:16 We do have a test,

1:13:19 the test is the pandemic

1:13:21 that

1:13:22 Tested the solidity and the response capacity of the institutions,

1:13:27 so the institutions need to be solid

1:13:30 and also have response capability.

1:13:33 Technology is the best transparency tool.

1:13:37 And also,

1:13:39 the rule of law is not enough.

1:13:41 We also need ways,

1:13:43 there,

1:13:44 there are always ways to avoid procurement,

1:13:46 so we need to have law

1:13:48 control,

1:13:49 oversight and strong technology platform as to procurement.

1:13:53 We need to talk about the comprehensive nature,

1:13:56 that is to say,

1:13:57 transparency,

1:13:57 ethics,

1:13:58 and during emergency.

1:14:00 The opportunity,

1:14:01 the timeliness of the actions and open data also

1:14:05 includes the population as part of social control,

1:14:08 social oversight to have concurrent

1:14:11 control to generate governance

1:14:13 and also decision making,

1:14:15 therefore.

1:14:17 When we look towards the future and the path to follow,

1:14:20 we need to make

1:14:23 Our own individuals within procurement more professional

1:14:27 and open data

1:14:29 should exist throughout the processes.

1:14:32 We should also include citizens,

1:14:35 train them,

1:14:36 teach them.

1:14:37 We also need to look into more modern technology

1:14:40 for procurement and also.

1:14:43 Think about the use of chatbox

1:14:45 in

1:14:46 artificial intelligence for

1:14:49 helping the users,

1:14:50 the intelligence within the business for suppliers and buyers and centralized

1:14:55 purchases are some of the basic elements and this is the way

1:14:58 that led Ecuador to create a project that we call centralized

1:15:04 purchasing project for strategic supplies and medicines to have a transparent

1:15:10 method.

1:15:11 Thank you very much.

1:15:15 Inspired for your insight and it is very interesting to see how you quickly reacted

1:15:19 to fix any issues that may come out from your transparency of the data.

1:15:23 Thank you so much.

1:15:24 We have

1:15:25 now to move on to our next country that will be Senegal,

1:15:28 Mr.

1:15:28 Nyang.

1:15:29 I'm pretty sure that he's waiting to share

1:15:31 with us,

1:15:32 uh,

1:15:32 the experience of Senegal.

1:15:34 Thank you,

1:15:34 Ms.

1:15:34 Nay.

1:15:40 Mercy,

1:15:41 Madame

1:15:42 Jasper.

1:15:44 Thank you kindly.

1:15:44 I hope you can hear me.

1:15:47 Yes,

1:15:48 to eat.

1:15:53 Hello.

1:15:57 Abumaandeka.

1:16:00 As you know,

1:16:01 The first COVID case,

1:16:03 COVID-19,

1:16:04 appeared in Senegal

1:16:05 at the beginning of March 2020.

1:16:09 And at the behest of all the uh countries affected,

1:16:13 a number of specific adapted arrangements adapted to the situation

1:16:17 were

1:16:19 in uh

1:16:19 applied in uh um

1:16:21 in

1:16:22 an emergency situation.

1:16:24 So when you don't have a public procurement system

1:16:27 at the outset,

1:16:28 you have to create

1:16:29 one

1:16:30 and that may be insufficient,

1:16:32 so you need to have additional

1:16:33 measures adopted

1:16:35 in order to

1:16:36 uh

1:16:36 complete

1:16:37 your response.

1:16:39 So our response was organized on two levels.

1:16:41 First of all,

1:16:42 a review of the codes of public procurement,

1:16:46 as well as the existing arrangements,

1:16:49 and then adapt these to the emergency situation as was the case when

1:16:53 the pandemic struck.

1:16:55 As well as the adoption of new uh measures better adapted to the

1:17:01 situation and in order to better respond to COVID-19 in order to avoid,

1:17:06 avoid a humanitarian crisis

1:17:09 and with a number of uh humanitarian

1:17:12 Uh,

1:17:12 modalities as announced by the World Health Organization.

1:17:16 By way of information,

1:17:16 I'd like to recall that Senegal

1:17:19 led a,

1:17:20 uh,

1:17:20 full reform of its procurement,

1:17:22 public procurement market system

1:17:24 in 2008

1:17:25 by

1:17:26 applying

1:17:27 the,

1:17:27 um,

1:17:29 WIMU

1:17:30 directives.

1:17:31 Eight countries are members of WIMMU

1:17:33 and all the number of countries.

1:17:35 We've started to internalize the uh directives in terms of public

1:17:41 procurement with different,

1:17:42 with different sectors.

1:17:44 So this led to a way more directive,

1:17:47 and that triggered the modification of a fundamental

1:17:51 law.

1:17:53 Which is the code of administration obligations,

1:17:56 which devoted a number of important principles in terms of public

1:18:01 procurement and orders.

1:18:02 What was added or modified rather in this whole apparatus

1:18:06 were rules that govern preparation,

1:18:09 uh,

1:18:10 markets contract award,

1:18:11 as well as the whole public procurement,

1:18:14 uh,

1:18:15 process.

1:18:15 All of this

1:18:16 is

1:18:18 stipulated in our decrees.

1:18:21 And so there are specific categories of buyers and suppliers,

1:18:27 but they can never uh be

1:18:29 under or out of the cover of the specific uh rules of application.

1:18:33 Another specific clause was added.

1:18:36 And the same law actually prescribes that an open

1:18:40 tendering bidding process is the actual mode of contract award

1:18:45 and the contracting authorities

1:18:47 by way of principle

1:18:48 must have recourses,

1:18:50 recourse to this,

1:18:51 and there can be no waivers to those

1:18:54 specific conditions as stipulated in our guidelines.

1:18:57 Now simultaneously,

1:18:58 simultaneously in the public procurement

1:19:01 processes,

1:19:02 a number.

1:19:04 Of countries and.

1:19:07 As

1:19:08 All our member countries,

1:19:10 this relies

1:19:11 on the same directives with the transparency and

1:19:14 openness of the procedure and a number of principles

1:19:17 that

1:19:18 actually had been difficult to reconcile

1:19:22 with the requirements and means of selectivity and emergency.

1:19:27 And in Senegal,

1:19:28 there is an arrangement which is

1:19:30 favorable to emergency

1:19:32 acquisitions,

1:19:33 especially

1:19:34 when these are imperious,

1:19:35 and there is a,

1:19:37 a code which is the outcome of the 2018 reform that stipulates

1:19:42 that

1:19:43 in those situations where there is an extreme and urgent need,

1:19:48 especially an unforeseeable consequence or something

1:19:50 that happened and that falls beyond

1:19:53 uh the contract.

1:19:55 There has to be,

1:19:57 there

1:19:58 is an open procedure that has to be triggered and it has to be transparent.

1:20:03 That same article.

1:20:05 Extends the scope of application and this uh waiver to

1:20:10 the markets with general mobilization measures as well as alert

1:20:14 measures,

1:20:15 red flag measures.

1:20:16 At the same time,

1:20:17 we have to recall

1:20:19 that the direct processes stipulated by

1:20:22 this article

1:20:24 was submitted to

1:20:25 uh control with a prior

1:20:27 authorization of a priori contracting.

1:20:31 Which stipulates according to the state which disposes of 24 hours to respond.

1:20:37 Should there be an unfavorable reaction or notice

1:20:40 because the state does not have to give a uh an authorization,

1:20:44 but should there be an unfavorable notice,

1:20:46 the contracting authority

1:20:48 has to

1:20:49 notify the supervising body.

1:20:52 And then the Secretary-General of the presidency has to be

1:20:56 notified

1:20:57 and then a statement is made as to the

1:21:00 unfavorable uh

1:21:02 decision made by the

1:21:03 uh Central Directorate of Public

1:21:05 procurement,

1:21:06 which is the a priori

1:21:08 controlling

1:21:09 and oversight entities.

1:21:10 I,

1:21:10 I can understand that some of these procedures.

1:21:13 Actually,

1:21:14 uh,

1:21:15 pushed

1:21:15 the,

1:21:16 uh,

1:21:16 public authorities during the pandemic

1:21:20 to adopt a new decree

1:21:22 and something that would be better adapted to responding to the pandemic and

1:21:27 also preparing for

1:21:28 future ones.

1:21:29 And so the

1:21:31 point here

1:21:31 was to uh create an article which was adopted on March 18,

1:21:36 2020

1:21:37 and which

1:21:38 excludes out of the scope of.

1:21:40 Application of public procurement,

1:21:42 the,

1:21:42 the application of work,

1:21:44 supply or services of

1:21:46 supply of goods and services in fighting against the

1:21:50 pandemic.

1:21:50 So those two articles are important and were adopted.

1:21:53 What is also important to mention is that the decree was not very precise

1:21:57 as to the codes that would be eligible

1:22:00 and so this leads the way to all sorts of interpretations.

1:22:04 But of course,

1:22:05 in these kinds of situations,

1:22:06 what is feared is that

1:22:08 some contracting authority behavior

1:22:11 will

1:22:12 actually engage

1:22:13 uh

1:22:14 uneligible and inadmissible um

1:22:17 players,

1:22:18 but of course,

1:22:19 this does not put away the

1:22:22 emergency

1:22:23 uh procedures that have to be adopted in states

1:22:26 of emergency and the obligations that I've just recalled,

1:22:30 as well as the transparency arrangements.

1:22:34 You will also agree with me

1:22:36 that the choice of a confidential

1:22:39 procedure

1:22:40 and communication

1:22:42 are constraints,

1:22:42 but these are sound practices,

1:22:44 of course,

1:22:45 because it makes it possible

1:22:46 to combine

1:22:48 the

1:22:48 uh

1:22:50 Speed of action as well as safeguarding the principles

1:22:54 and access to information in an open fashion.

1:22:58 And of course,

1:22:58 this allows for savings and guaranteeing of the quality of products.

1:23:05 And so a part of the social budget that had to be allocated

1:23:09 to

1:23:10 the health sector in COVID-19.

1:23:14 This also had to involve the uh

1:23:17 acquisition of

1:23:19 food

1:23:20 supplies from Burkina Faso.

1:23:22 And we also suggested

1:23:24 that a new procedure,

1:23:26 a confidential procedure,

1:23:28 be launched within the framework of a direct competitive

1:23:31 dialogue with several suppliers that had been selected

1:23:34 after

1:23:35 uh communication and publicity campaigns had

1:23:38 been launched defining the specifications.

1:23:42 Lotte contractant of the CD alale.

1:23:45 Alou

1:23:49 In addition to this example.

1:23:55 We applied waivers

1:23:58 so that some suppliers would be able to provide their.

1:24:04 Goods more

1:24:06 quickly.

1:24:10 In some instances.

1:24:13 The dispute committee had to get involved.

1:24:18 And resolve some of these issues.

1:24:25 Responses were provided,

1:24:27 uh,

1:24:27 which reflects the importance

1:24:30 of the contracting authority and these commissions.

1:24:36 These commissions exist to make sure that the scope of application is followed.

1:24:43 The contracting authorities.

1:24:47 Who wanted

1:24:48 to.

1:24:50 Undertake

1:24:51 undertake direct contracting,

1:24:54 often encountered issues and had to provide.

1:25:00 A justification

1:25:01 for why they wanted to use that specific type of contracting.

1:25:09 In some instances,

1:25:11 audits will need to be conducted to make sure that the contracts

1:25:16 are in compliance

1:25:19 uh with the decrees that have been passed.

1:25:21 It is also important to note here

1:25:24 that

1:25:28 The

1:25:30 The situation has really improved in Senegal a lot,

1:25:34 and so some of these

1:25:36 decrees have.

1:25:39 Uh,

1:25:39 been put to an end,

1:25:41 uh,

1:25:41 as the authorities determined that there really wasn't a use for them anymore,

1:25:46 specifically because,

1:25:48 uh,

1:25:48 the pandemic situation has improved in

1:25:51 Senegal.

1:25:53 We also took measures in Senegal to stop the spread of the pandemic,

1:25:57 and these were authorized by authorities at the beginning of the pandemic.

1:26:02 There were restrictions on

1:26:05 movement between regions and public and private gatherings.

1:26:10 These measures were often

1:26:12 difficult to reconcile with some of our public procurement rules.

1:26:24 to,

1:26:24 to,

1:26:24 to share of the countries has a very rich experience now dealing with the pandemic,

1:26:27 and I'm sure we can stay here for hours,

1:26:29 but we have also to leave the floor to two other countries.

1:26:33 Then,

1:26:33 uh,

1:26:34 I would please ask your

1:26:35 permission to continue with our next speaker.

1:26:42 We are now inviting Morocco

1:26:44 to share uh and Mr.

1:26:46 Labdawi to share his

1:26:48 thoughts

1:26:49 on

1:26:51 On the topic and please Mr.

1:26:53 uh Labdawi,

1:26:54 if you can

1:26:55 uh keep your discussion in 10 minutes,

1:26:57 I would really appreciate it.

1:26:58 Thank you.

1:27:13 Thank you very much.

1:27:15 I hope you're able to hear me.

1:27:21 Allow me to introduce myself.

1:27:24 My name is Abdelak Labdawi.

1:27:27 I work.

1:27:31 In Morocco on public procurement,

1:27:34 and it is a pleasure for me to discuss this very important topic with you today.

1:27:39 I'm going to share Morocco's experience with you today.

1:27:44 My

1:27:45 presentation.

1:27:47 We'll discuss the following.

1:27:49 The challenges of public procurement in Morocco.

1:27:53 And

1:27:54 I

1:27:55 will also mention here that

1:28:00 Based on data from 2019,

1:28:02 uh,

1:28:03 public procurement.

1:28:09 Accounts for a,

1:28:12 for 20% of GDP.

1:28:16 And many of this goes to construction.

1:28:21 The interpreter notes that there's a great deal of interference in the audio.

1:28:25 Apologies.

1:28:27 I think another microphone

1:28:29 is on.

1:28:34 No,

1:28:34 everyone else is talking,

1:28:35 can you please mute yourself?

1:28:37 Thank you.

1:28:43 Sebon mercy

1:28:51 Public procurement.

1:28:53 Accounts for a great deal of our economic activity,

1:28:57 and it has a multiplier effect.

1:29:00 On every sector of the economy.

1:29:02 Let's talk a little bit about the context in which these measures were taken

1:29:07 for public procurement.

1:29:11 A state of emergency was declared.

1:29:16 By

1:29:17 a decree.

1:29:20 On March 23rd of this year.

1:29:22 And this

1:29:23 decree

1:29:25 is the legal basis

1:29:28 for

1:29:28 declaring

1:29:29 the

1:29:30 state of emergency

1:29:32 and allows us to look at current regulation and adapt it to the circumstances

1:29:37 of the time.

1:29:39 With regard to the main provisions that Morocco took

1:29:43 to address public procurement during the pandemic.

1:29:49 A decision was made to focus

1:29:52 initially.

1:29:53 On

1:29:55 The actual procurement process.

1:29:58 And secondly,

1:29:59 we focused on the execution of contracts.

1:30:03 And

1:30:04 finally,

1:30:05 we adopted

1:30:06 specific measures

1:30:07 uh for the public health sector.

1:30:11 With regard to measures taken

1:30:13 that affected the procurement process itself,

1:30:16 the main measures are as follows.

1:30:19 We extended

1:30:21 the

1:30:23 Uh,

1:30:24 validity period for

1:30:28 certification for,

1:30:30 uh,

1:30:30 various entities that we worked with,

1:30:31 laboratories,

1:30:33 companies,

1:30:34 etc.

1:30:35 Some companies had certification for procurement

1:30:38 that actually expired during the lockdown period

1:30:40 and we had to make sure that their certification could be extended.

1:30:45 At that time,

1:30:46 we weren't able to meet in person to address that issue and so,

1:30:51 We decided.

1:30:54 To just

1:30:55 extend the validity period of the certificates that

1:30:58 we had already awarded to those companies and

1:31:02 laboratories.

1:31:05 As

1:31:08 You know,

1:31:08 we would,

1:31:09 in the past publish our procurement

1:31:11 announcements in physical newspapers or journals.

1:31:16 So we decided to

1:31:18 make a change there and publish those announcements

1:31:21 electronically.

1:31:26 Morocco.

1:31:28 Starting in 2017

1:31:31 has advanced slowly but surely.

1:31:36 Towards

1:31:38 electronic systems.

1:31:39 We hope to have all of this in place by 2021.

1:31:43 But you also need to make sure that electronic signatures are possible.

1:31:54 So that you can

1:31:58 Authentify or authenticate rather,

1:32:00 uh,

1:32:00 the signatures,

1:32:01 the electronic signatures.

1:32:03 So that also needed to be

1:32:06 addressed.

1:32:09 So we decided

1:32:10 to digitize all of the documents

1:32:14 that

1:32:16 are involved in the procurement process.

1:32:18 So everything could be done electronically and that would allow procurement

1:32:22 to take place

1:32:23 without requiring people to physically

1:32:26 travel.

1:32:31 We

1:32:31 also decided.

1:32:35 To

1:32:39 Make changes to our portal,

1:32:42 our procurement portal and make it a little bit easier while at the same

1:32:47 time ensuring the security and integrity of

1:32:51 everything that was uploaded to that platform.

1:32:54 Now let me move on to the 2nd set of measures that we're taking,

1:32:57 taken.

1:32:59 In some instances,

1:33:00 we were able to extend the length of the contract,

1:33:03 as my colleague from France mentioned as well.

1:33:08 This,

1:33:09 uh,

1:33:10 prevented,

1:33:11 uh,

1:33:12 certain penalties from being applied.

1:33:14 But of course,

1:33:15 uh,

1:33:15 proof or justification would have to be,

1:33:18 uh,

1:33:18 presented in order to

1:33:20 extend those.

1:33:23 Contracts.

1:33:27 In other instances.

1:33:31 We

1:33:32 put a moratorium on certain payments that would have to be made

1:33:36 uh due to uh the

1:33:39 uh health emergency that was

1:33:41 declared.

1:33:45 We wanted to make sure that we weren't

1:33:48 hindering companies in any way.

1:33:51 Uh,

1:33:52 especially if they were experiencing cash flow issues.

1:33:59 We also required certain signatures for various parts of the contracting process.

1:34:07 And so we decided.

1:34:09 And not to uh ask for paper documents during the

1:34:14 uh pandemic.

1:34:15 A lot of this could be done electronically or

1:34:18 electronic documents or electronic signature.

1:34:25 We looked at other regulations as well.

1:34:33 We looked at certain provisions.

1:34:38 Uh,

1:34:38 specifically.

1:34:40 Uh,

1:34:40 an article on payment.

1:34:46 We had certain ceilings in place before the

1:34:49 pandemic and uh we adjusted those ceilings.

1:34:54 Uh,

1:34:55 during the pandemic.

1:35:01 We also granted.

1:35:03 Other waivers that apply to other parts of the public procurement decree.

1:35:12 In some instances,

1:35:14 uh,

1:35:14 certain contracts were awarded and it wasn't

1:35:17 always necessary to go through a competitive,

1:35:19 uh,

1:35:20 process.

1:35:21 Here,

1:35:22 I'd like to

1:35:23 Note that this kind of flexibility doesn't automatically mean

1:35:28 that

1:35:29 we completely

1:35:30 ignored

1:35:32 our

1:35:32 main principles of public procurement,

1:35:35 which is,

1:35:36 uh,

1:35:36 having open access to the procurement process.

1:35:40 We kept files of everything.

1:35:42 Everything is traced and you can always go back and,

1:35:46 uh,

1:35:47 look at all of the expenditures that were

1:35:49 made to see if there were any discrepancies.

1:35:56 We

1:35:58 Also.

1:36:02 Uh,

1:36:02 made some adjustments

1:36:04 to the rules governing the,

1:36:07 uh,

1:36:07 expenditures,

1:36:09 uh,

1:36:09 due to

1:36:10 the circumstances of the pandemic.

1:36:14 We decided to um

1:36:17 stop these measures last August.

1:36:22 Because there was no longer uh any justification for it due to

1:36:26 uh the change in circumstances.

1:36:30 Here,

1:36:30 I'd also like to note that in 2019,

1:36:34 we received 16,000 bids electronically over the entire course of the year.

1:36:39 But for the 1st 10 months

1:36:41 of 2020,

1:36:43 we received 31,000

1:36:46 electronic bids,

1:36:47 which is twice as many as we received the previous year.

1:36:51 And this was mainly due to the extraordinary progress

1:36:55 that we have made in uh going paperless for our procurement processes.

1:37:01 Allow me to conclude here with just a few words.

1:37:05 I think that we were successful

1:37:08 in Morocco in countering the negative effects of the pandemic.

1:37:13 Uh,

1:37:13 thanks to the 5 following points.

1:37:16 One,

1:37:16 we adopted a preventive

1:37:19 cooperative approach.

1:37:21 2,

1:37:22 we have a strategic oversight entities.

1:37:26 3,

1:37:26 we provided support measures

1:37:29 and we'd already made a great deal of headway in going paperless.

1:37:34 And we also,

1:37:35 uh,

1:37:35 made a lot of uh attempts to grant waivers when necessary.

1:37:39 Thank you very much.

1:37:43 Ms.

1:37:43 Lavdawi,

1:37:43 it was very interesting to see that Morocco

1:37:46 is progressing so much in public procurement.

1:37:48 Now we are going to our,

1:37:50 uh,

1:37:50 list,

1:37:51 last but not least,

1:37:52 uh,

1:37:52 country

1:37:53 representatives that is,

1:37:55 uh,

1:37:55 Ms.

1:37:55 Hang

1:37:56 from Vietnam.

1:37:58 I would kindly ask Ms.

1:37:59 Hank to take the floor

1:38:01 and please turn your camera on.

1:38:06 Ms.

1:38:06 Hang.

1:38:11 Ms.

1:38:11 Han,

1:38:12 can you hear us?

1:38:21 Miss Hang.

1:38:33 Do we have any

1:38:36 Difficulties

1:38:37 to connect with Hang.

1:38:41 OK,

1:38:42 in,

1:38:42 uh,

1:38:43 while we wait for Ms.

1:38:44 Hang to connect,

1:38:45 we can move on to

1:38:47 and go in-house.

1:38:49 And have our

1:38:52 Speakers from discussions from the World Bank.

1:38:59 Belita.

1:39:01 Can you tube in and let us know your thoughts?

1:39:05 From this discussion so far and also,

1:39:07 OK,

1:39:08 and also how the World Bank sees the COVID-19 response.

1:39:14 Yes,

1:39:14 thank you very much for having me.

1:39:16 It was a

1:39:17 great pleasure for me to be part of this distinguished and honorable panel.

1:39:21 I enjoyed the discussions very much.

1:39:24 Um,

1:39:24 the presentations,

1:39:25 the remarks by Peter and Carrie,

1:39:27 very relevant and,

1:39:28 uh,

1:39:29 Um,

1:39:30 very,

1:39:30 um,

1:39:31 informative and also thought provoking and

1:39:34 the experience from colleagues in other countries.

1:39:37 Um,

1:39:37 in listening to all this discussion,

1:39:40 um,

1:39:40 uh,

1:39:41 it,

1:39:41 it seems that,

1:39:42 uh,

1:39:43 what I hear resonates with what,

1:39:45 with what we have seen

1:39:46 in,

1:39:47 um,

1:39:47 uh,

1:39:48 bank,

1:39:48 uh,

1:39:49 engagement with countries during this period.

1:39:52 And it is clear that

1:39:53 countries all mobilized to uh adopt or adapt their legislation

1:39:59 to the increasingly challenging and urgent situation of COVID-19.

1:40:03 Um,

1:40:04 different ways either triggering or enhancing the existing

1:40:08 systems by direct contracting or non-competitive procurement.

1:40:12 Uh,

1:40:12 along with guidance and technical guidance or FAQs or uh tips and sheets to,

1:40:18 uh,

1:40:18 inform the procuring entities and help them come up to speed.

1:40:22 In some countries,

1:40:23 the fresh legislation to respond to the needs,

1:40:25 in others,

1:40:27 certain carve-outs from the procurement legislation itself.

1:40:29 As for the bank,

1:40:31 Um,

1:40:32 in bank-funded projects,

1:40:33 we also did the same in enhancing and simplifying our existing

1:40:38 provisions.

1:40:39 Uh,

1:40:39 it became clear that while the focus of the government was to respond

1:40:44 to the emerging needs to fight and contain COVID-19 to save lives,

1:40:48 um,

1:40:49 it is also clear that governments are struggling

1:40:52 or at least are trying to balance the needs

1:40:55 while procuring these large volumes of goods.

1:40:57 We heard from KAERI about what

1:40:59 $100 billion in 4 months

1:41:01 with increased commercial and integrity risks associated with

1:41:05 this procurement.

1:41:07 We heard and uh we've seen exactly the same that

1:41:11 while the focus is on

1:41:13 COVID-19 response procurement,

1:41:15 PPEs,

1:41:16 ventilators,

1:41:17 all these

1:41:18 uh supplies that are needed to save lives,

1:41:21 on the other hand,

1:41:22 there is a whole

1:41:23 universe of procurement that is already happening in the country.

1:41:26 That is not directly related

1:41:28 to COVID-19,

1:41:30 but that is equally important.

1:41:32 Infrastructure projects that were interrupted,

1:41:35 schools,

1:41:35 um,

1:41:36 textbooks,

1:41:37 uh,

1:41:37 other,

1:41:38 uh,

1:41:38 health projects or health,

1:41:40 health activities that were going on

1:41:42 in different,

1:41:43 um,

1:41:44 sectors that were also disrupted and I see that,

1:41:47 uh,

1:41:47 while the focus of this discussion is on COVID-19 response procurement,

1:41:51 that is very important to,

1:41:53 to keep in mind.

1:41:54 Um,

1:41:55 and what I hear as well and what we saw in the bank,

1:41:58 um,

1:41:59 response,

1:41:59 uh,

1:42:00 uh,

1:42:00 to COVID-19 in,

1:42:01 in client countries

1:42:03 that

1:42:04 what is important is to integrate procurement

1:42:06 in the larger operational risk framework.

1:42:08 Procurement rules are not the magic bullet.

1:42:10 Peter said it and he couldn't have said it better.

1:42:13 This is not a legal issue but a market issue,

1:42:16 a capacity issue,

1:42:17 uh,

1:42:17 in many cases,

1:42:18 integrity issue.

1:42:20 Um,

1:42:20 so procurement is not The only puzzle,

1:42:23 or a piece of the puzzle.

1:42:24 It is

1:42:25 a part of a conundrum where clients have to

1:42:28 balance all these competing interests of responding to the emergency,

1:42:32 ensuring transparency,

1:42:33 but at the same time,

1:42:35 um,

1:42:35 delivering the goods that they need.

1:42:37 Uh,

1:42:37 digitalization of procurement procedures seems to have been the

1:42:40 common theme that is our experience too that helped

1:42:43 the countries to immediately respond

1:42:46 but also to increase the transparency.

1:42:48 And what this crisis meant is an opportunity for reform.

1:42:52 First,

1:42:53 professionalization of procurement workforce is even more

1:42:56 important than just writing

1:42:59 great rules,

1:43:00 um,

1:43:00 you know,

1:43:00 that

1:43:01 are,

1:43:01 of course,

1:43:02 the,

1:43:02 the,

1:43:03 the,

1:43:03 the starting point but are not sufficient.

1:43:05 Empowering and encouraging public officials to take decisions without fear

1:43:10 of being,

1:43:11 um,

1:43:11 retributed,

1:43:12 of retribution of Fear of being audited and,

1:43:15 and being prosecuted.

1:43:16 In many countries we have seen

1:43:18 in response to procurement by COVID-19,

1:43:21 um,

1:43:21 lots of procurement officials are finding themselves into

1:43:24 having to defend these decisions which on one hand,

1:43:27 of,

1:43:27 of course we can't do without accountability.

1:43:30 On the other hand,

1:43:31 we have to

1:43:32 uh allow this,

1:43:33 this balance that people take decisions in the interest of,

1:43:37 of public interest.

1:43:38 And finally,

1:43:40 I would think since we have these lessons in the last 8 months,

1:43:43 are we prepared now for the second phase of

1:43:46 um of procurement of vaccines?

1:43:49 Um,

1:43:50 do we feel that,

1:43:51 do,

1:43:52 uh,

1:43:52 we feel that we have in place,

1:43:54 uh,

1:43:54 and now we have the knowledge to implement all those lessons that

1:43:58 we learned from the first phase in the procurement of vaccines which

1:44:01 will be equally challenging

1:44:03 and,

1:44:03 um,

1:44:04 I,

1:44:04 I leave it there.

1:44:06 Thank you,

1:44:07 thank you so much,

1:44:08 uh,

1:44:08 Belita.

1:44:09 I,

1:44:09 I'm sure that if we can continue you can always

1:44:13 guide us and

1:44:15 let us know more on,

1:44:16 on the procurement on,

1:44:17 on under the bank view.

1:44:18 But,

1:44:19 but now we have Ms.

1:44:20 Hang back.

1:44:21 Ms.

1:44:22 Hang,

1:44:23 I'm sorry that we lost you for,

1:44:24 for a second.

1:44:26 Can I ask you to

1:44:28 start with your presentation?

1:44:30 Thank you.

1:44:31 Yes.

1:44:32 Can't you hear me well?

1:44:35 Hello,

1:44:36 everyone.

1:44:38 Let me introduce myself.

1:44:40 Uh,

1:44:41 my name is Han.

1:44:42 I'm working for

1:44:44 the Ministry of Planning

1:44:46 and Investment

1:44:47 and,

1:44:48 uh,

1:44:48 under the

1:44:50 Public procurement agency.

1:44:53 Today,

1:44:54 I'd like to share

1:44:56 Vietnam's

1:44:58 experience.

1:44:59 In

1:45:00 procurement.

1:45:02 Uh,

1:45:02 medical

1:45:03 supplies and equipment

1:45:06 in,

1:45:06 uh,

1:45:07 COVID

1:45:08 pandemic.

1:45:10 Uh,

1:45:10 first,

1:45:11 uh,

1:45:12 in related to,

1:45:14 uh,

1:45:14 legislation

1:45:15 in Vietnam,

1:45:16 we have,

1:45:17 uh,

1:45:17 public procurement law.

1:45:20 And in the law,

1:45:22 we

1:45:23 permit

1:45:24 recruiting entity

1:45:26 to use

1:45:28 direct contracting

1:45:29 for procurement in

1:45:32 benefits.

1:45:34 And uh the system in Vietnam

1:45:37 is decentralized

1:45:40 so that

1:45:41 each procuring entity is in charge of what they buy.

1:45:45 And

1:45:47 How,

1:45:48 how much do you buy

1:45:49 and the price.

1:45:52 And in our law,

1:45:53 we also allow for a repeat order.

1:45:57 So that

1:45:59 if they,

1:46:00 uh,

1:46:00 if any supplier win.

1:46:03 It's a bit

1:46:05 before

1:46:06 and now in when the big situation

1:46:09 you NTT.

1:46:11 Can apply.

1:46:13 The same price

1:46:15 and the same condition of contract

1:46:19 to that uh

1:46:22 particular goods,

1:46:24 let's say,

1:46:25 uh,

1:46:26 any uh

1:46:27 uh ventilator or any uh

1:46:30 medical equipment.

1:46:32 So that we can control the price

1:46:35 and

1:46:36 at the time as well.

1:46:38 And uh

1:46:40 that is in,

1:46:41 in,

1:46:41 in our law.

1:46:43 Uh,

1:46:43 I mean that uh in legislation,

1:46:46 we allow

1:46:47 uh flexibility

1:46:50 for

1:46:51 blue entity

1:46:53 to buy the thing in time.

1:46:55 And to enable action

1:46:58 in dealing with benefit.

1:47:00 But in practice,

1:47:02 we face

1:47:04 some difficulty.

1:47:06 The first one is um

1:47:08 the supply capacity.

1:47:11 Uh,

1:47:12 back to March

1:47:15 and February.

1:47:17 So you may,

1:47:19 uh,

1:47:19 let's say for example,

1:47:20 for

1:47:23 Medical mass

1:47:25 is very high

1:47:27 and it's increasing day by day.

1:47:30 As you know that the population of Vietnam

1:47:33 now is over 90 million people.

1:47:38 So,

1:47:39 in domestic,

1:47:40 uh,

1:47:41 we are like

1:47:42 a mask.

1:47:44 And

1:47:47 Therefore,

1:47:47 it

1:47:48 uh Uruguay entity,

1:47:49 I means it a hospital.

1:47:52 Have to compete each other.

1:47:56 To buy masks.

1:47:58 And when uh

1:47:59 we have a look at the data,

1:48:02 it's at a price,

1:48:03 uh,

1:48:04 is

1:48:05 the price different,

1:48:06 differ.

1:48:08 Between

1:48:08 hospital and hospital.

1:48:11 But luckily that um

1:48:14 compared to the market price.

1:48:17 Uh,

1:48:17 supply its a hospital bed.

1:48:21 is even uh

1:48:23 much lower.

1:48:25 It's about 1/3 or

1:48:27 uh

1:48:28 um

1:48:29 half

1:48:30 or half of the market price.

1:48:33 But

1:48:35 I fluctuated.

1:48:37 And each hospital have different price for the mask.

1:48:44 So that we decide to increase

1:48:46 the domestic um

1:48:49 supply.

1:48:51 And

1:48:52 the Ministry of Health and Ministry of Commerce

1:48:56 work slowly

1:48:57 with industry.

1:48:59 To

1:49:00 uh manufacture,

1:49:02 manufacture the masks.

1:49:05 And at the first stage,

1:49:07 we don't have much uh surgical mask.

1:49:11 So

1:49:12 for the population,

1:49:14 for the people

1:49:16 outside hospital,

1:49:17 we encourage them to use

1:49:20 cotton.

1:49:21 Uh,

1:49:21 masks

1:49:22 that the Vietnam can

1:49:25 do,

1:49:25 uh,

1:49:26 as much

1:49:27 as,

1:49:27 as we want because

1:49:29 we export a lot of garment

1:49:32 products.

1:49:33 So for cotton masks,

1:49:34 uh,

1:49:35 it is easier

1:49:36 for us.

1:49:37 So we encourage people

1:49:39 to use

1:49:41 cotton

1:49:41 masks.

1:49:43 And

1:49:44 uh to live,

1:49:45 uh,

1:49:45 to save

1:49:46 the surgical mask for

1:49:49 hospital.

1:49:50 And then in uh Apple

1:49:53 and May,

1:49:55 and we agreed to supply

1:49:57 so that even for

1:49:59 surgical

1:50:00 uh marks or cotton mug,

1:50:02 uh,

1:50:03 we,

1:50:04 we have

1:50:05 uh a very high production

1:50:09 of these goods and

1:50:11 we even can export

1:50:13 to overseas

1:50:15 for masks.

1:50:17 That is the,

1:50:18 the,

1:50:19 the for,

1:50:19 uh,

1:50:19 we,

1:50:20 we face,

1:50:22 uh,

1:50:23 in supply

1:50:25 and we try to overcome it.

1:50:27 And now we become

1:50:29 a spotter

1:50:31 for it.

1:50:32 And the second one is a

1:50:34 ventilator.

1:50:37 Uh,

1:50:37 in Vietnam,

1:50:38 we

1:50:40 We are,

1:50:41 uh,

1:50:42 we have a very limited number

1:50:44 of ventilators.

1:50:46 We have more than

1:50:47 90 million people.

1:50:50 But

1:50:51 uh

1:50:52 throughoutucachi,

1:50:55 we only have more than 4000 ventilators.

1:51:03 And luckily for Vietnam that we control the ban,

1:51:06 ban the week very well

1:51:07 and until now,

1:51:08 we only have uh

1:51:11 1300

1:51:14 Yeah.

1:51:16 Infected people.

1:51:18 So I don't know if uh the number of infected people increase fast.

1:51:22 I don't know what,

1:51:23 what will happen

1:51:25 for Vietnam.

1:51:26 Maybe we,

1:51:26 we will become

1:51:28 in panic.

1:51:31 Uh,

1:51:31 at that time,

1:51:33 because we only have 4000,

1:51:35 uh,

1:51:35 ventilator,

1:51:36 and it is not easy to buy

1:51:39 even with contract,

1:51:40 um,

1:51:42 direct contracting

1:51:43 because there's no supply.

1:51:45 Uh,

1:51:46 in

1:51:47 other country,

1:51:48 they forbid export.

1:51:52 So what we

1:51:53 try is that

1:51:55 we um

1:51:57 Uh,

1:51:58 we buy,

1:51:59 uh,

1:52:01 a ventilator is stuck

1:52:02 in Vietnam.

1:52:04 And after that,

1:52:06 we try to persuade our industry.

1:52:10 To manufacture ventilator.

1:52:13 And one big guy in Vietnam,

1:52:16 do that follows.

1:52:18 And,

1:52:19 and they now even

1:52:21 export

1:52:22 so that uh

1:52:24 in case of uh ventilator,

1:52:26 we,

1:52:27 we can,

1:52:27 Vietnam can produce

1:52:30 and uh

1:52:31 we don't have much pro profit

1:52:34 with that.

1:52:36 At

1:52:36 present,

1:52:37 and now.

1:52:39 And

1:52:40 um

1:52:41 Uh,

1:52:42 that is the,

1:52:43 the,

1:52:43 the first difficulty,

1:52:46 which is the supply capacity.

1:52:48 And

1:52:50 we try to,

1:52:50 to,

1:52:51 to produce domestically.

1:52:55 And the second one is uh

1:52:57 the price

1:52:58 of the other

1:53:00 medical equipment.

1:53:02 And with modern

1:53:03 uh

1:53:04 medical equipment,

1:53:05 we cannot produce ourselves.

1:53:08 We have to embark.

1:53:11 But the price is very,

1:53:13 very,

1:53:14 uh,

1:53:15 differ

1:53:16 and it,

1:53:17 it,

1:53:17 it,

1:53:17 it,

1:53:17 it differ from hospital to hospital,

1:53:20 from that province to the other province,

1:53:23 and that is a difficult question for us that,

1:53:27 uh,

1:53:28 how to manage the price.

1:53:31 We give the flexibility

1:53:33 to hospital.

1:53:36 And to province

1:53:38 because the system in Vietnam is to change your life,

1:53:44 but I have to,

1:53:45 I have to stop you here because unfortunately,

1:53:48 we are running out of time

1:53:50 and I'm,

1:53:51 I'm really sorry that I'm interrupting you

1:53:53 and we need to yes,

1:53:54 yes.

1:53:55 You are,

1:53:55 yes,

1:53:56 yeah,

1:53:56 well,

1:53:56 the,

1:53:56 the

1:53:57 time is going tense,

1:53:58 so we are trying to,

1:53:59 to keep everyone,

1:54:00 uh,

1:54:01 giving the opportunity to speak to all our distinguished

1:54:03 guests.

1:54:04 I will now move to,

1:54:06 uh,

1:54:06 Francisca.

1:54:07 Thank you,

1:54:08 thank you very much,

1:54:08 Ms.

1:54:09 Hang,

1:54:09 and I will now

1:54:10 move to

1:54:11 our practice manager of health,

1:54:12 Miss,

1:54:12 uh,

1:54:13 Francisca,

1:54:14 um.

1:54:17 Thank you.

1:54:19 Can,

1:54:19 can you hear me?

1:54:22 Can you hear me?

1:54:23 Yes,

1:54:23 yes,

1:54:23 we can.

1:54:24 Yes.

1:54:24 Great.

1:54:25 Thank you.

1:54:25 Uh,

1:54:26 this has been a very rich session and,

1:54:28 uh,

1:54:29 we could obviously have spent a lot more time on this.

1:54:32 The,

1:54:32 the,

1:54:32 the two speakers,

1:54:33 um,

1:54:34 really gave a good oversight of some of the challenges and some of the,

1:54:37 I'll just go quickly over some of the things that I picked from.

1:54:40 The discussions and the,

1:54:42 the,

1:54:42 the speakers as well as the panelists.

1:54:44 Um,

1:54:45 Peter's point about,

1:54:46 uh,

1:54:47 we need to have a multi-sectoral approach to this.

1:54:49 It's not just a legal issue.

1:54:50 It's not just a procurement issue.

1:54:52 We also need to have the technical people as part of this.

1:54:55 And one other important um entity that uh uh uh uh

1:54:59 Carri brought in is the civil society and the journalists,

1:55:02 uh,

1:55:02 because if they're not part of the process and being carried along,

1:55:05 they end up being those that bring out.

1:55:08 Highlight the problems that we face and that is one of the um

1:55:12 issues that we're facing in one of the countries that I face,

1:55:15 that I manage is that uh it's the,

1:55:17 it's the civil societies and the media

1:55:20 that are complaining about how the process,

1:55:22 the procurement process

1:55:23 have not gone very well.

1:55:25 And that the monies have not been used as appropriate and supplies are

1:55:29 sitting in,

1:55:29 in,

1:55:30 in,

1:55:30 in storage and not being utilized,

1:55:33 um,

1:55:33 cost of,

1:55:33 of,

1:55:34 uh,

1:55:34 procurement were too high.

1:55:36 So

1:55:36 the thing is,

1:55:37 it's important to carry the civil society

1:55:39 and the journalists along from the very beginning

1:55:42 so that the more people know about what is going on,

1:55:44 the more people know about the challenges that this,

1:55:46 uh,

1:55:47 the,

1:55:47 the,

1:55:47 the government is facing in this

1:55:50 difficult situation,

1:55:51 the better you are able to carry them along and then

1:55:53 They're also,

1:55:54 they also act as checks and balances for the system.

1:55:57 And the other point that I,

1:55:58 I,

1:55:59 I took from all this is it,

1:56:00 it's not just having emergency procedures and guidelines in place,

1:56:04 but also revisiting them.

1:56:06 On a regular basis,

1:56:07 um,

1:56:08 for pandemic preparedness,

1:56:09 we do what we call simulation.

1:56:11 So you have a plan,

1:56:12 you have an operational plan,

1:56:13 but

1:56:14 at least once or twice in a year you actually

1:56:16 pretend as if there is a pandemic and you

1:56:19 actually go through the process so that all pieces,

1:56:21 all the different parts

1:56:22 of the puzzle actually

1:56:24 have a,

1:56:24 a chance to work through it to see that the system,

1:56:27 the,

1:56:27 the procedures that you have put in place

1:56:29 are working.

1:56:30 Um,

1:56:31 and,

1:56:31 and,

1:56:31 and that's why I would say it's good

1:56:33 to have like a dry run during non-emergency periods

1:56:37 of some of these emergency procedures that we,

1:56:39 we put in place

1:56:41 to be able to fast track a lot of the procurement.

1:56:44 Um,

1:56:44 um,

1:56:44 if we don't do that,

1:56:46 uh,

1:56:46 there's a chance that people who we think are,

1:56:49 are,

1:56:49 are knowledgeable

1:56:50 have forgotten the procedures

1:56:52 and then don't follow it at the time of um um of,

1:56:55 of the emergencies.

1:56:57 Um,

1:56:57 if we're,

1:56:58 if,

1:56:58 if,

1:56:59 if we also have to be

1:57:00 conversant that it's the same set of human resources that are doing things

1:57:04 that maintain the essential services.

1:57:06 Somebody also talked about,

1:57:08 look,

1:57:08 it's not just addressing an emergency at the time.

1:57:10 There are other regular things that need to continue,

1:57:13 but it's the same sets of human resources that have to do everything,

1:57:17 so

1:57:18 they need to be up to speed about

1:57:20 what are the things that they need to do

1:57:22 to maintain essential services and what are those special.

1:57:25 Um,

1:57:26 systems that need to be,

1:57:27 um,

1:57:27 put in place during the emergency procedures.

1:57:30 We had a good set of,

1:57:31 um,

1:57:31 um,

1:57:31 panelists discussing about their experiences in the,

1:57:34 the various countries

1:57:36 and their very rich uh um experiences and I hope people have been able to learn

1:57:40 some things from there and,

1:57:41 and for me,

1:57:42 um,

1:57:42 maybe just to speak about some of the,

1:57:44 um,

1:57:45 um,

1:57:46 situations that we,

1:57:46 we faced,

1:57:47 uh,

1:57:47 uh,

1:57:48 in a few of the countries that I,

1:57:49 I managed

1:57:50 as part of putting the um COVID operations together.

1:57:54 We did in some cases apply the retroactive financing

1:57:58 so that um while the projects were being put in place,

1:58:01 the governments had the leeway to be able to continue with their processes,

1:58:05 um,

1:58:05 making sure that they followed the required rules

1:58:07 so that once the projects were effective,

1:58:09 then it was very easy to um um

1:58:12 um reimburse the government's expenses as part of the,

1:58:15 the,

1:58:15 the,

1:58:16 the,

1:58:16 the grants or the loans for the countries.

1:58:19 There was a lot of use of data and technology to monitor the processes.

1:58:23 In one of the countries that I work on,

1:58:25 and they use that data,

1:58:26 the,

1:58:26 the,

1:58:27 the information they got from that data to constantly

1:58:30 change the operating plans

1:58:33 to make sure that things were going in place.

1:58:36 In other countries they had emergency

1:58:37 procedures that allowed increasing thresholds,

1:58:41 um,

1:58:41 allowed requests for proposals to,

1:58:43 to be made by the same set of suppliers that they are already known.

1:58:48 Because there are lots of cases where um um suppliers that are

1:58:52 not known that are just popping up because taking advantage of the situation

1:58:56 um um

1:58:57 came in to put,

1:58:58 put um requests for proposals um in place.

1:59:00 So using having a set of suppliers that you know can help

1:59:04 at least for those basic things that need to continue

1:59:07 um is a good thing.

1:59:08 Then there was also a lot of direct contracting um,

1:59:11 um,

1:59:11 and,

1:59:12 and using um established firms.

1:59:15 Um,

1:59:15 um,

1:59:15 and,

1:59:16 and then

1:59:16 also making sure that the media and the civil

1:59:19 societies are carried along like I mentioned before.

1:59:22 So this has been a very rich experience and I thank everybody for,

1:59:25 for,

1:59:25 for helping me to learn about these experiences as well.

1:59:28 Um,

1:59:28 and I look forward to any,

1:59:30 um,

1:59:30 um,

1:59:31 questions that come up.

1:59:32 Unfortunately,

1:59:32 I might have to disconnect in about a minute or two,

1:59:35 but thank you very much.

1:59:36 Thank you,

1:59:36 thank you very much.

1:59:37 Cesca,

1:59:37 thank you

1:59:39 for your thoughts.

1:59:40 And now we are going to take

1:59:41 two questions,

1:59:42 but all the questions will be responded in our,

1:59:44 uh,

1:59:45 blog.

1:59:45 So please continue posing your question.

1:59:47 We will make sure that every single question is is responded.

1:59:50 I saw Mr.

1:59:51 Trete that was very active responding,

1:59:53 uh,

1:59:54 through live chatting

1:59:55 with our participants.

1:59:56 Now we have

1:59:58 one question for,

1:59:59 uh,

1:59:59 Carre.

2:00:00 If you can help us,

2:00:01 uh,

2:00:02 with,

2:00:02 with this question,

2:00:03 it's still realistic to consider COVID-19 pandemic as an emergency situation.

2:00:08 Isn't it time for countries to set

2:00:10 more realistic short to medium term procurement strategies

2:00:14 or visions in response

2:00:16 to COVID-19

2:00:17 instead of continuing to work under emergencies

2:00:20 crisis situation?

2:00:26 Sure,

2:00:26 I,

2:00:26 I wish I had a,

2:00:28 a clear answer to that.

2:00:29 I think as Peter mentioned in the chat,

2:00:31 that is definitely the million-dollar question.

2:00:34 Um,

2:00:34 but it's something that we're actively thinking about as we start to transition,

2:00:38 I guess,

2:00:39 to thinking about this as a longer-term problem

2:00:41 and then also eventually to the recovery.

2:00:43 Um,

2:00:44 but something to echo what Ayo was just saying,

2:00:47 um,

2:00:47 I think one of the key things that we've seen is that there is a,

2:00:51 a positive role that civil society can actually play.

2:00:54 In the process itself.

2:00:56 Um,

2:00:57 I think some of the recommendations that I mentioned,

2:01:00 um,

2:01:00 and,

2:01:00 and we put up,

2:01:01 um,

2:01:03 included in my slide,

2:01:04 and we also have a full blog about it that I'm happy to share.

2:01:06 Um,

2:01:07 for inclusion in,

2:01:08 in the follow-up,

2:01:09 um,

2:01:10 but some of those

2:01:11 recommendations such as having

2:01:13 clear policies that are sort of published and open and

2:01:16 everyone is on the same page about what's happening,

2:01:19 having open data that people can access,

2:01:22 everyone can mute if it's not talking,

2:01:24 we have a lot of interferences.

2:01:26 OK,

2:01:26 thank you,

2:01:27 sorry.

2:01:31 No,

2:01:31 no worries.

2:01:32 Um,

2:01:33 But I think some of these,

2:01:35 um,

2:01:37 Some of these key recommendations that have come out in the context of COVID

2:01:41 are relevant

2:01:42 anytime,

2:01:43 even when it's not in a pandemic.

2:01:45 Um,

2:01:45 and I think that's something important to,

2:01:47 to recognize.

2:01:48 Um,

2:01:49 the clearest thing that we've seen is countries that

2:01:52 are already implementing open contracting that have open data

2:01:56 that different actors are able to use and analyze.

2:01:59 They've been able

2:02:00 to react better

2:02:02 in the face of the pandemic,

2:02:03 um,

2:02:04 but that continues

2:02:05 even in normal times as well.

2:02:07 So I think a lot of the recommendations that have come up today

2:02:10 are relevant,

2:02:11 even when it's not a,

2:02:13 an emergency,

2:02:14 urgent emergency situation.

2:02:18 Thanks.

2:02:20 Thank you,

2:02:21 Carol.

2:02:21 Thank you.

2:02:22 I,

2:02:22 we will now,

2:02:23 uh,

2:02:24 have a

2:02:25 question for Ms.

2:02:25 Lee.

2:02:26 I,

2:02:26 I don't know if Ms.

2:02:27 Lee is still online.

2:02:29 Is it clear,

2:02:29 can you hear us?

2:02:36 There was a specific question about France and how they use

2:02:40 types of verification,

2:02:42 what types of verification they requested from the buyers.

2:02:48 Is the flu?

2:02:54 Well,

2:02:54 um,

2:02:55 I think that all the,

2:02:56 all our questions can be

2:02:59 asked

2:02:59 in,

2:03:00 in blog.

2:03:00 hello?

2:03:02 I think it's.

2:03:06 We

2:03:09 Could you please repeat the question?

2:03:10 Thank you.

2:03:10 Yes,

2:03:11 it would be interesting to know what types of verification was requested from buyer

2:03:15 on the use of purchasing procurement.

2:03:18 We are struggling to measure the impact of COVID-19 financing.

2:03:22 So what kind of verification was,

2:03:23 were requested from buyers?

2:03:31 Uh.

2:03:37 I'm not exactly sure which type of verification

2:03:42 uh you're referring to specifically,

2:03:44 but buyers mainly had to provide

2:03:48 uh

2:03:49 uh verification.

2:03:59 Uh,

2:03:59 that had to do with protecting workers' health and environmental,

2:04:04 uh,

2:04:05 considerations.

2:04:07 I'm not sure if those are the types of verification that you were,

2:04:11 uh,

2:04:11 referring to.

2:04:17 Everyone that had this kind of question,

2:04:19 they can further develop in the chat and then we can

2:04:22 uh

2:04:23 continue to respond to this question afterwards.

2:04:26 Now,

2:04:26 as this session unfortunately is coming to an end,

2:04:30 I would kindly ask Cuba to summarize,

2:04:33 to give her final conclusion on the event.

2:04:35 Thank you.

2:04:39 Thank you very much,

2:04:40 uh,

2:04:40 Maniola for excellent moderating of this session.

2:04:44 Uh,

2:04:45 it's very difficult to summarize,

2:04:47 but,

2:04:48 uh,

2:04:48 of course,

2:04:49 we all learn from each other.

2:04:51 Um,

2:04:53 when is it an emergency and when uh

2:04:56 governments could possibly start planning for these emergencies.

2:05:00 The pandemic started as an emergency,

2:05:02 but now

2:05:03 we know the,

2:05:04 the,

2:05:05 the needs.

2:05:06 We know

2:05:07 uh that after the,

2:05:09 the first procurement for

2:05:12 uh protection of health,

2:05:14 uh,

2:05:14 there is a procurement for vaccines,

2:05:17 so this can be planned.

2:05:19 Um,

2:05:20 we learned from our speaker.

2:05:22 that uh

2:05:23 while we work on expedited procedures,

2:05:27 we still have room to be transparent,

2:05:30 to use

2:05:30 open contracting data um

2:05:33 uh forms uh to,

2:05:36 to verify the impact of the procurement,

2:05:39 whether it reached its intended beneficiaries.

2:05:43 Um,

2:05:44 there is a lot of experiences that we learned from the different,

2:05:48 uh,

2:05:48 esteemed speakers and panelists.

2:05:51 Uh,

2:05:51 and I hope that this discussion among procurement

2:05:56 practitioners,

2:05:57 academicians,

2:05:58 and government officials

2:06:00 continue,

2:06:01 uh,

2:06:02 before,

2:06:02 uh,

2:06:04 ending this session,

2:06:05 which we're 6 minutes

2:06:08 overdue.

2:06:09 Uh,

2:06:10 I want to thank,

2:06:11 uh,

2:06:11 Nagaraju who is chairing the

2:06:14 community of practice for procurement for development.

2:06:20 And thank

2:06:21 Manola for organizing this and thank you

2:06:24 all esteemed speakers and panelists for participating with us.

2:06:28 I look forward for more collaboration with all of you,

2:06:31 maybe on different topics.

2:06:33 And thanks,

2:06:34 we will

2:06:35 uh distribute.

2:06:36 And uh circulate the,

2:06:38 the minutes of uh

2:06:40 this session and probably a,

2:06:42 a blog later that we can

2:06:44 um uh email it to all of you.

2:06:47 Thank you very much and stay safe.

2:06:49 Hopefully,

2:06:50 this pandemic will end soon for all of us.

2:06:57 Well,

2:06:57 thank you,

2:06:58 thank you very much.

2:06:59 Thank you too.

2:07:00 Thank you.

2:07:01 Many thanks everyone.

showAllTimestamps
no
transcript
Good morning. On behalf of procurement for Development SCOP, I invite you to this event on public procurement, legal and regulatory framework. And procurement during emergencies and lessons learned during COVID-19. And before the COP, we would like to thank Hiba Vina, the panelists, keynote speakers, Peter and Carrie, and discussant Belita and Io. For joining this event. Now I request Hiba to start the event with a welcome. Thank you. Thank you, Nagaraju. Good morning. Good afternoon. Good evening, everyone. We're very excited to have you here today with us to discuss this important uh session. We have a rich uh partic experience from participants from different parts of the world. And uh we would like to have this interactive discussion. Manuela, who is our moderator for this session, will explain how the discussion will take place. But first, please allow me to welcome our keynote speaker, Mr. Peter Tripte. He's a senior fellow in Public procurement law at the University of Nottingham with With huge and large experience. For the interest of time, I would only introduce the speakers and the panelists, but their, their bios are attached in the invitation and I hope that you will all uh uh have a look at their bios after the meeting. Uh, with us also as a keynote speaker, Ms. Carrie Klutz. Uh, Ms. Carrie Klutz is the head of the Country Programs, Open Contracting and Partnership. And she will, uh, give us her experience on what transparency and what, uh, measures can be done and can be, uh, required during emergency operations and how To ensure that what, where the money is spent is known and where the benefits have been attained. I'm very pleased to welcome a few friends from all over the world. Mr. Sahel Nang, he is the Director General of Public Procurement in Senegal, Ms. Silvana Vallejo Paez, Director General of Public Procurement in Ecuador. Mr. Abdus Sadeq Labdawi from the min he's the ministerial treasurer of the Ministry of Economic and Finance, Ms. Nugen T Tui Hang. She's the deputy director general of the Public procurement under Ministry of Planning. And Claire, Ms. Claire Ifi, Ili, sorry, she's in charge of the regulations and procurement and public procurement and of the negotiation for France of European draft text relating to public procurement. We have esteemed, very experienced uh uh panelists, and I'm sure we will learn and we will engage with them to have the best out of this session. The discussions are our Fearless Ladies of the World Bank, Belita Menka, she's a senior counsel from the World Bank. uh Ms. Ayo Akala, Francesca Ayodii Akala. She's a practice manager for health and I can tell you, she's one of the most busiest persons in the world right now. Uh dealing with emergency all over Africa. So welcome, Ayo. And finally, our fearless moderator, Manola Majo. She's a procurement specialist in, in, um, in the, in the Latin American region of the World Bank. These emergencies have put a lot of heads together to see how best to respond, how best to benefit those are affected. The World Bank has Been um in many ways a leader in introducing procedures and guidance on how to deal with emergencies, whether it is man-made emergencies, natural emergencies that we have now, which is global and I think in our lifetime, this is the uh the, the severe, the most severe uh emergency that we have dealt with on a global level. Or even a post war, post-conflict. So we have procedures, we have uh legal frameworks that we require in our operations. But the discussion today is how can we ensure that the legal framework, the procedures under emergency can be Really a driver to response, can be really a driver to achieve results and of course in a most transparent and in the most uh um effective way to the beneficiaries and to those who need it, need it most. We all understand that in emergencies, chaos can come in and chaos can open a lot of opportunities for maybe misuse or leakages. So we have our esteemed uh panelists and discussant to tell us what could be done to minimize uh these, uh these measures. In the interest of time and because we want to hear from our Um, uh, esteemed keynote speakers and then esteemed panelists. I will stop here. But last but not least, I would like to introduce our our director, Vinay Sharma. He's the director of the, uh, he's the global director of procurement in the World Bank and he oversees the procurement function in implementation. Welcome, Vina, please come in. Thank you. Uh, I hope you're able to, to hear me. Uh, thanks Nagaraja and Hiba for inviting me. The topic being discussed is very timely, and I'm happy that the community of practice has assembled this excellent panel. To talk about the framework under which public procurement operates under emergencies. As you know, COVID-19 crisis has left important lessons on governance and enhanced collaboration on national, regional and international level, as well as open and innovative ways to promote dialogues between public and private stakeholders. Public procurement was and is a critical piece in the response from countries, and it is fascinating to see the difference in responses by different countries. Most countries use their established frameworks for emergency contracting, ensuring the the necessary flexibility to respond to the extremely urgent needs, but some some countries developed additional guidance for this specific emergency. We saw unprecedented conditions, highlighted exposure of procurement systems to integrity risks, and this is what Cuba was talking about. Uh, Perhaps not very surprisingly that the reaction to transparency and accountability was unequal. What was surprising was that while many countries were affected by the crisis simultaneously, we did not see coherent collaborative approaches. Emergency situations generated conditions that encourage the improper use of emergency funds and extraordinary budgets in some cases. However, to ensure the integrity of these extraordinary resources for public purchasing and contracting and the proper exercise of people's rights during the emergency, many responsible governments increase transparency in the use of open data through full, continuous, timely, true, and verifiable information expressed in languages that could be understood by others. Uh, you, you might perhaps know that the World Bank had carried out a study, a survey of about 110 countries, and we have found that the quality of procurement systems actually had a direct bearing on the health outcomes of different countries. I am sure that the discussions today are going to enrich our understanding of how, how public procurement should will and can. Help address emergencies in, in countries. Thank you very much for inviting me. Many thanks Vinai for your opening remarks and your continued support to our community of practice. Now before going to our keynote speaker, I would like to welcome all of you for joining us from all over the world. Uh, this event is organized by Community of Practice Procurement for Development, and this event will take about 2 hours. We are using a very innovative platform called Kudo, and please use your left side of the screen to, uh, channel through the language of your choice. Uh, we are also live streaming our event in, uh, uh, other social media and YouTube. Um, I will, um, ask all to have the the mic, uh, muted while you are not speaking and for every one of you that is live connected, please use the chat box to post your questions and your comments to our panelists. Now, uh, let's move to our keynote speakers. As Hiba introduced our first keynote speaker is Mr. Peter Tripte. He will share with us his academic perspective on how to ensure compliance with core procurement principles while procuring during state of emergency. Thank you. Thank you very much and thank you very much for inviting me to, to this event, which promises to be a really interesting one, I think, given the breadth of experience that we, we have on the, on the, on the panel. Um, I've been asked to look, I, I, uh, Manola mentioned academic perspective. I'm actually going to look at some of the, the legal issues that I've been dealing with because I've been helping some countries address some of the problems that have been raised by the pandemic, at least in terms of, of procurement regulation. And, um, I'd quite like it, but it's, it's much wider than, than legal, and I think that's one of the big problems that we're facing. It's very easy to say, oh, get the lawyers to sort something out. It, it's not, it's not that easy. It doesn't work quite like that. And I'm going to state the obvious at the beginning. I mean, the, the, the, the people introducing the, um, the, the, the panel, so Nagaraju and uh Heva have already referred to it. This is a pandemic without precedent. I mean, we haven't seen anything like this. And of course it's caused legal problems, but in all jurisdictions, I mean, uh, in developed and in developing countries alike, um, yesterday, I don't know if people have been following this, but yesterday the National Audit Office in the United Kingdom, the country that I'm from, um. Uh, published a report, uh, which said that of the 18 billion pounds worth of contract, that's almost $25 billion.24 something, um, most of those contracts were based on recommendations only by ministers and different government advisors, so there was no competitive procurement, uh, for that, which is a pretty huge number that have failed to follow procurement rules, and, you know, this is a, Well, it is a developed country, but it's soon to become developing, I think, given it's decision to leave the European Union, but that's a political statement. And I'm sure Kerry will have something to say about this, because the other thing that came out of this report was that there were no records and no minutes of any meetings kept. So everything was completely opaque and non-transparent, which of course means there was no possibility of verifying or even knowing. Uh, what happened. So it's a pretty dreadful situation and the UK is clearly not an example of how to do this, um, properly. But I did say that it, it's such an unusual situation. I don't believe that any procurement system, however well it's drafted, however complete it is, would be able to address all of the problems thrown up by the pandemic. Um, and in, and in some ways it's less a legal problem than a question of market failure. There are huge problems of supply, no supply of some product, a lack of supply because we weren't ready for it of others, but also of, of countries leveraging their power and resources to stockpile, um, escalating prices, not just a question of supply and demand, but really unfair and abusive pricing as well as fraudulent entrance, uh, which all leads to a higher risk of corruption, and there are lots of cases of contract non-performance. So these are really. Failures of the market, uh, an inability to address the problem and not really a legal issue. I'm not trying to justify lawyers or excuse us for having drafted bad regulations, but I think it is way beyond just a legal question. Although obviously that there are legal issues um involved. I think maybe one of the things that we could say also is that um although the, the initial problems do appear to be legal, and of course, where that's a problem of legislation, we need to sort that out for the future, um, the scope and the severity of, of the crisis means that there's much more that needs to be done. There are very few emergencies on this scale, but there are plenty of emergencies around and they are predictable. Uh, I'm thinking of things like the weather-based disasters, hurricanes, droughts, floodings, which I know a lot of the countries that are participating on this panel, uh, will suffer. Now we don't know when these are going to happen, but we do know that they will happen and usually fairly regularly, and we know what's needed. They've happened before, so we know what we need to deal with them. And so the solution there is really to be prepared. For those sorts of emergencies, arguably, we should have been prepared for this one, scientists will tell us that it was, this was all completely foreseeable. There was no, not a surprise, it's just the, the timing was a surprise, but it was going to happen. So, I think the best solution may well be that we should be prepared and framework agreements, which I know, um, I'm sure we'll be discussing at some point, uh probably the best solution for dealing with those sorts of predictable emergencies, and that is to have available a pool of suppliers and contractors at the ready so that when the emergency happens, we're ready to deal with it. We can do something about it and not run around uh trying to work out what, what it is we can do. Um, now, the, what I've been asked to do is really to talk about compliance with core principles of procurement regulation. Um, and even in an emergency, of course, we can follow procurement rules. The key is really to ensure compliance with the procurement legislation that is in force, and that's a question of how good that procurement legislation is. But really, the, the first thing we should be doing is trying to apply competitive procedures, either the most transparent, the most competitive procedures like open, for example, an open or a public tender, whenever that's possible, um, especially when the timelines can be met. Because not every procurement in an emergency requires immediate action. You may have to do something that day or in the next few weeks. But as we've seen from this pandemic, we've been at it already sort of the best part of 9 months and it's going to carry on. That's not an emergency in the sense of having to do something immediately, that's a, a longer term solution. So in terms of procurement, we have time to plan and to do things that we need to do. It's not, everything doesn't have to be done. Uh, immediately, so I think there is, uh, an argument for saying that we should be able to apply the procurement rules, um, as they are. Um, of course, there are some problems that are built into procurement procedures. Um, for example, and now those are things that perhaps is in writing regulations or in encouraging different regulations we're responsible for placing. We've put, we've set up those obstacles. Things like, um, waiting for bid securities to be, uh, to be received from banks and checking those bid securities. I know Vina who spoke earlier. Um, has an issue with bid securities, and, and I think we all need it, we have an issue with bid securities because, uh, are they really necessary in Europe, we don't use them at all. I mean, when I'm teaching, when I'm teaching procurement and I have to talk about bid securities, most of my students from here say, what are they? We don't need them, they're not necessary, but of course, a lot of countries do want them. But for our current purposes, they simply add delay and they cause a problem for applying. Um, the normal procedures, and I'm using the word normal in inverted commas, approval mechanisms. If you have to follow all of these procedures and get a number of different approvals, well, you know, if the people aren't available, you're not going to get those approvals, and that's a delay, and that's built into the regulation rather than, um, a, a problem caused by, uh, the normal procurement, um, regulation. And when we can't use competitive uh tendering, when we can't use those, those, the most uh transparent procedures, then the question is going to be trying to maximize the use of flexibility and speed under the legislation and, and all procurement systems that I've seen do have some um procedures there to deal with emergency situations. It's usually some form of single source procurement or direct contracting. It doesn't mean you have to go to one. Uh, bidder, you can go to several, but it's a direct, um, link, a direct negotiation rather than advertising and, and calling people in by invitation. And that's quite normally, quite normal in emergency situations. All legislation does it and all countries need to have them. Uh, but some procurement systems, and of course that's the result of the, the approach of the government, are so fearful of having direct contracting that they make it very difficult and sometimes render it completely ineffective. Uh, and by that I mean using approval mechanisms, checks and balances that are, Uh, probably, uh, too burdensome and then undermine totally the possibility of using, uh, speedy procedures, and I think that's something that those responsible for drafting legislation need to be aware of. It's not, it's not, um, inherent in procurement regulation itself. So I think what I'd like to say is we really need to have a, a balance of risk and outcomes and that's in general, not just in response to COVID. I think it's become very obvious in the case of COVID, but um I think in general we need to have the same, the same sort of um approach. Uh, now some of the legal issues that I've been dealing with quite a lot really. Uh, go get, go around the issue for triggering the emergency provisions. How, how and when can we use these different emergency, uh, provisions? In some cases it's a question of having an emergency declaration. Uh, these, um, appear in many, in many country systems, especially those who've have, have recently reformed their systems. But it also applies in developed countries like the United States. Now, in the US there are plenty of other provisions which will trigger emergency provisions, but there is one, which, uh, which allows certain, um, payments to be made, which is triggered by an emergency declaration. The trouble with waiting for an emergency declaration is really a question of delay. In the United States, uh, the president happens to be Trump, of course, but the president waited rather a long time before issuing a declaration. His declaration of emergency came 20 days after the World Health Organization decided to declare an emergency. Not so long you may say, but in those countries where you, you can use shorter time periods in the case of urgency, you could easily do a full competitive procedure using accelerated timelines within those 20 days. So I think that's quite a significant delay in terms of um declaring an emergency. They're very discretionary because they, they're often the conditions are not very clear in the legislation, so it's really up to the president or his advisors to say when that should happen. And the other problem with the declaration of emergency is really the length of validity. Um, the, in the US, for example, I, I, I, uh, the US is not so bad. I'm just using an example because in this case, it, it's quite a, a, a difficult, um, or it raises a bit of a problem. In the US, the declara, the president's declaration of emergency lasts for one year, it's valid for one year. So even if it's, if it's um an urgency that some, some critical um issue that, that, that led to the declaration, it lasts for a year, so the urgency's been and gone by the time the procurement is done, so that really doesn't reflect the need. Another method um that, that is used in different countries depends on the existence of immediacy. So, um, if, if there isn't enough time, if there is insufficient time to use the competitive procedures, then that's the time at which you can use the more flexible procedures. And in theory that allows the procuring entity to take action when it recognizes the urgency. Um, That, um, so it's based on, on the fact that there isn't enough time, but there are usually conditions as well. So conditions that the, the, um, emergency shouldn't have been foreseeable and shouldn't be, um, the result of any dilatory conduct on the part of the procuring entity. And this, this is sort of problematic and has been in, in, in the legislation that I've been looking at. Because even if the pandemic wasn't foreseeable, and the scientists may disagree on that, once it's happened, the consequences of that pandemic become foreseeable. So we know what needs to happen over a period of time, it's no longer urgent and therefore it might, the, the procurement might fall outside these definitions of urgency. And if there's any delay in addressing dilatory conduct, so for example, uh sorry, any delay in taking action if there is dilatory conduct, so for example, there wasn't budget available or people couldn't agree on what to do or we were waiting for approval, that takes away the foresee the unforeseeability and it's no longer urgent. So the whole trigger for using urgent and flexible procedures disappears. And there are of course then definitions of urgency, we can have different degrees, so they say if it's very urgent, you can do it immediately. If it's less urgent but still urgent, then you can do a a little bit longer. You don't do direct, it's direct solicitation, you take a little bit more time and it's almost like a competitive procedure. Um, but that causes a problem, I think in reality, because what procuring entities need or procurement officers need when we have an urgency is some sort of certainty. What can I do at this point in time? They don't need, um, tools of statutory interpretation, well, guidelines who say this is how you interpret this provision, that's, no, they just need to know what they can do, and I think that's, that's turned out to be something of, um, a problem in, in practice. Now the real issue is always going to be one of, of question, is always going to be one of time and speed. Um, now, normally, the distinction is made, uh, based on bidding periods. There's time for submission of bids. So if that's too long, um, then we're not going to be able to deal with something urgently, those need to be shorter. But it's not just a question of, of, of bid submission timing. Time can also be lost through lots of other, uh, provisions. So, you always have to prepare technical specifications. I mean, you can't get rid of that as a requirement. You can't just buy something. Um, without knowing what you're buying. Of course, that's exactly what the UK did, and, you know, they turned to a producer of vacuum cleaners to produce all of the equipment that they needed, Dyson. Um, so they didn't really know what they were doing, and that led to a pretty much a failure in, in the procurement. But there are other things like the bid securities I've mentioned, you have to have you, you need clarifications maybe um there are bid opening procedures which are always get in the way. There's time for evaluation, award procedures and approvals. All of these things cause a, a delay and I think that's where we need to, to, that's what we need to look at. Um, because procurement legislation as it stands is pretty much a blunt instrument to, to address these issues. In practice, what I've seen in most countries, and I've helped draft some of this a special guidance to, um, tell procuring entities what it is they can and can't do. Um, now that's because maybe the, the legislation isn't. Isn't clear enough, but it's legislation, we don't write every detail in legislation, so you need, you need somehow to have some capacity to understand all of this, so it may be a question of capacity, of course, but this guidance has been necessary to spell out the core principles. Now in some cases, that's indicated shortcomings in the law, and those, like I've mentioned, description of urgency and that of course needs to be amended for the future. But dealing with all of these guidelines, the irony of that, all of that really is that by the time the guidance has been prepared and gone through several iterations, the emergency is over. I don't mean the pandemic, I mean the urgent element of the pandemic, that's finished and, and really there's no, uh, you know, there's nothing left to do. So just finally, I, I think perhaps I should say we really need to prepare for the next time in the hope of course that there's never going to be a next time, or at least not quite like this. So I'd suggest that we start looking at having frameworks in place to deal with predictable emergencies, and as I said, scientists will say that this was foreseeable, we were ill prepared and we should have been ready for it, even if we didn't believe that, so we need to get ready for more. We need to clarify the laws to trigger flexible procedures quickly and simply, so if it's a declaration, let's get that right, if it's a definition, let's get that right. I think we should remove obstacles which do not add value, so bid securities, why do we need those? We can at least replace them by bid securing declarations, which also take time but are much quicker and, and simpler and cheaper. Maybe we should consider getting rid of approvals where they don't add value, so we could strengthen uh complaint mechanism to deal with cases where there are problems. Maybe we need a manual in place rather than guidance, but constant manuals so that we can have lessons learned. And I think we probably need to be ready, more ready to address market failures, and procurement bodies are really not renowned for doing this. So we should be applying competition rules, we should be applying anti-corruption provisions, so fraudulent conduct, abusive market behavior and profiteering, also something that came up in the National Audit Office report that I mentioned. And as VA said at the very beginning, Uh, maybe we should look more at cooperative procurement so that countries are not working in isolation. This might reduce abusive market behavior and ultimately might ensure a bit more equity in the distribution of the products and services that we need. Now, there's much more, of course, to discuss, um, and I'm looking forward very much to the presentations to come, but I really need to stop at this point because I think I've gone over time. Thank you very much. Well, uh, thank you, thank you very much, Mr. Tere for your insight. Interesting view on procurement driven by immediacy and also considering the situation caused by the pandemic, more of a question of market failure, and I'm pretty sure our legal colleague Belita is very happy with your initial remarks on how this is not a legal issue, so. Now we can move to our second speaker, Mrs. Carrie Klotz. We invite her to share her take on open procurement data to analyze and share information to predict and manage critical supply chain. Ms. Klotz, the floor is yours. Great. Thank you so much and, and thanks so much for inviting me, um, Nagaraji and Hiba in particular. Um, I'm really excited to be here with some familiar faces and to, to meet some new, um, folks as well. Um, and I think mostly I'm, I'm impressed to see that there's still this much interest in this topic even six months in, unfortunately, and, and hopefully the end is in sight. Um, but I think as we know now more than ever, procurement is key to both an effective crisis response, of course, perhaps more importantly, an effective recovery. Um, so when the COVID-19 pandemic hit earlier this year, it didn't take long to realize, and Peter pointed out some of this, um, how unprepared most procurement systems were to deal with the emergency. Um, and of course, significant concerns were raised and continue to be about the potential for inefficiency, ineffectiveness, and abuse during the pandemic response. As we know all too well now, COVID put the world in crisis mode or chaos as HIPA mentioned. Um, and governments in all levels were mobilized to purchase urgently needed medical equipment and other supplies and services to fight the virus. Um, we know now that governments spent at least $100 billion on COVID contracts in just the 1st 4 months of the pandemic, and that continues to go. Um, I can cue the slides, no worries. Um, unfortunately, in many cases, we also saw a Hunger Games scenario, which is chaos, uh, where governments were directly competing against each other for limited amounts of equipment and supplies. Not to mention that procurement agencies might not have known. What they needed to buy in the first place. And, of course, the bad actors taking advantage of the chaos to enrich themselves at the expense of medical patients. And that's what this slide is getting at. Um, so COVID really put procurement into the spotlight like never before. And we've all seen the stream of media reports of COVID gone wrong, and especially this report that Peter mentioned that came out yesterday in the UK that is, um, Uh, not, not so, not so positive. Um, but across the world, millions upon millions of dollars have been squandered on questionable purchases. Um, we've seen ventilators that never arrived in Israel, counterfeit masks and test tubes that turned out to be soda bottles in the US, and this is an example of a raspberry farm that scored a $6 million contract to supply ventilators in Bosnia. Beyond that, there's also the devastating economic impact of the COVID pandemic, which we all know too well. Um, the bank itself, I think we know, has warned that the current crisis could undo decades of global poverty reduction. So the huge economic economy that's smarter, more efficient government spending is more important than ever before. So what can we do? As the IMF managing director, Georgieva said, back at the very beginning of the crisis, governments need to spend more money more quickly, but keep the receipts. At the Open Contracting Partnership, we couldn't agree more. For those who don't know us, we spun out of the bank's governance global practice about 5 years ago, and we now work with governments around the world and their stakeholders to implement data-driven reform projects to improve the effectiveness and fairness of government contracting, and we often work in coordination with bank projects. At its core, open contracting is about publishing and using. Carrie, sorry to interrupt. I would kindly ask you to speak a little bit slower so our interpreters can, uh, do their work while online. Thank you. Sure. Of course. So open contracting is about publishing and using open, accessible, timely information on government contracting to engage citizens and business in identifying and fixing problems. We look at the entire chain of public contracting, including planning, tendering, awards, and implementation through to the delivery. Our work with partners around the world has shown that open contracting can make a big difference when it's done right. By that, I mean beyond legal frameworks alone. As Peter rightly mentioned, the high-putty, open data that's accessible. Businesses and citizens need to have a voice and government has an ear to listen. Open contracting has led to significant savings and improved citizens services, and ultimately rebuilt trust. So what we've seen over the past few months is countries doing just this have been able to respond better to the crisis. The pandemic has actually demonstrated the vision of open contracting. And we've seen clearly that countries investing in open contracting data and working with civil society and business for planning and monitoring have seen better results. Then the next slide. Um, Perhaps most importantly, in order to prepare better in the long term for the recovery we all hope is coming soon. We've developed some recommendations based on our work with partners over the past several months. First, on policy. Encourage our client countries to ensure open emergency procurement that makes data and information awards public. Help to make emergency procedures and procurement transparent and public and clearly justified, as Peter highlighted well. 2, coordination and oversight. Centralized and coordinated procurement can help with quick and better planning. Help your client countries set goals and priorities, and consolidate emergency committees for quick decision making. 3. Disclosure and open data. We can recommend that client governments publish and use open data on emergency procurement in order to analyze and share information, to predict demand, understand the market, and manage critical health supply chains. It's key to ensure safeguards and full transparency in bank-funded projects as well, to be able to track and monitor procurement, including related to the rapid credit facilities that are ongoing. We're happy to provide advice and guidance on what this could look like with a reminder that you can still buy fast but keep the receipts. For those client countries that are still working toward digital procurement, disclosing information to the extent possible is still crucial for building trust with citizens. Number 4, in terms of red flags analysis and supplier insights, especially given the huge supply shock during the emergency, there's a clear need to help buyers find suppliers, but also a need to do due diligence on them and understand track records, as many of the recent news stories have made apparent, including some that Peter mentioned and our raspberry farmers from earlier. Last but not least, collaboration with civil society, journalists, and other stakeholders for monitoring is key. We can encourage and support partnerships among civil society, audit institutions, media, and procurement authorities to monitor effective spending and delivery of goods and services. In many countries, such monitoring and advocacy has already led to more transparency, accountability, and effectiveness, as we'll see now. We're working in various capacities with all the countries that we'll hear from on our panel to come. Uh, so I'll give a cour demon of a couple of additional examples from Paraguay, Moldova, and Nigeria, which are different ways how open contracting allowed them to better plan, buy, and deliver essential COVID contracts. In Paraguay, as you see here, the government's procurement agency wanted to ensure transparency of its COVID-19 emergency purchases. So we worked with our partners there to ensure accurate identification and publication of this information within 10 days of purchase. Data included the buyers, prices, suppliers, and information about the items being purchased, as well as their delivery. They've also published a searchable data set of COVID-19 procurement as you see here. And the open contracting approach is also enabling more agile procurement as they were able to create a registry of suppliers of emergency items that makes it easier for government agencies to act or respond and frameworks to make it easier to procure these items. They've also worked to ensure that the public could easily monitor COVID-19 purchases by establishing a dedicated searchable webpage, as well as a dashboard and mobile app that sends notifications of newly awarded contracts. We've already seen users of this data include government itself, business, civil society, academia, and media who have actually been reporting on irregular procurements, including a case where volumes of tonic water were purchased at 5 times the normal price as an alleged COVID-19 treatment. This led the procurement authority to introduce new rules for reference prices on emergency purchase to be published, which hopefully will avoid other inflated emergency procurements now and in the future. Over the oceans in Moldova, Positive Initiative is the largest patient rights advocacy group in the country. It's also part of our Lyft Impact Accelerator program. There, they built a coalition of 30 nonprofit and governmental organizations that in just a few weeks, launched a public procurement platform that displays detailed information about all government contracts for supplies and services to fight COVID. This has benefited a range of stakeholders as we've seen journalists running investigations, civil society tracking spending, procuring entities using the tools for better planning, and suppliers conducting market analysis. And down in Nigeria, related to the government's commitment to the IMF's rapid Credit facility funding, the procurement Authority has begun publishing information on COVID procurement through the Nigerian Open Contracting portal. This enabled a coalition of civil society organizations to use this data for advocacy and monitoring. The information is only available in PDF for the time being, but it's already led to an increase in coverage of information published, and discussions are ongoing to publish this information in a more usable and open format for COVID procurement and beyond. And this includes looking toward the new bank-supported EGP system. In the slide here, um, you see, actually right now, uh, is, is happening the launch of our recent action research project where we worked with teams from 12 countries around the world to analyze emergency procurement and make recommendations to improve efficiency, effectiveness, fairness, integrity, and equity. There were a range of challenges that are highlighted on this slide, but one recurring theme that echoes many of the lessons previously cited, as well as our upcoming comparative legal research that we're doing with Thomson Reuter Foundation's Trust Law Project. But we've seen that good policies with solid legal frameworks and especially standardized, timely, good quality data publication has enabled the best analysis. We have a couple of upcoming um sets of research that will announce a call for proposals on. Uh, the first one, especially looking at how open contracting approaches can support effective and efficient spending during the recovery from the impacts of COVID-19. Um, we'll also be doing a bit of research looking specifically at, uh, the commitments around the IMF rapid Credit Facility, um, and the pledges that countries have made to Published tracks. We'd love to collaborate with you all on that. The next slide, you can see how we've worked over the past months to write up a series of best practices, as well as developing resources to support country partners to respond to the pandemic. Here you see our guide to collecting and publishing COVID-19 procurement information, which we know is already being used by our partners in Argentina, Ecuador, South Africa, and. The COVID-19 page on our website links to this and many additional resources that can be useful to you and your client countries. From mapping COVID-19 data to the OCDS to tips for publishing relevant information, to red flags indicators, to supporting use, analysis and monitoring of data. We also always offer our OCDS helpdesk, a free of charge bespoke service for those working to publish open contracting data. And we're especially excited about a new tool that will launch next month with Transparency International's Health Initiative, our COVID procurement Explorer, which will be a platform to collect COVID-19 procurement information, as well as lessons learned and best practices from all around the world. We're piloting initially with 5 countries from Latan, ECA, and Africa, but we're keen to work with others to expand coverage far and beyond, far and wide beyond us. And looking beyond the crisis response itself and toward the eventual recovery, we're especially excited about the vaccines that they're promising this week. As the vaccine comes closer to reality, we'll be working with several of our partners to develop a COVID vaccine procurement tracker. This would include data on budgets, info about how the vaccines will be purchased and processes followed, and we also hope to support our partners on delivery and quality of the vaccines as well, looking toward equitable distribution. We know that challenges will continue during the recovery phase, and we're especially focused on the crucial sectors of health, infrastructure, and small and medium-sized prizes. So we know many governments focus on these areas as the crisis transitions from emergency response to longer-term recovery. The bank and international partners can of course help support governments to be set up for success during this next phase as well. Again, the key things to consider in an effective emergency response and recovery are the right policies that allow for transparency, good quality, accessible open data, coordination of demand and response among different actors, and data use and monitoring. The good news is that you don't have to reinvent the wheel over and over again. We have global resources like the Open Contracting Data Standard, related tools and methodologies, proven tactics and templates for designing reforms, as well as change management process to go along with them. And other resources created by the open contracting community adopted and used by your client. One thing that's for sure, the fiscal impact of COVID-19 will be unprecedented. We want to make the most of what limited public money there is to effectively fight the virus, protect our populations, and rebuild our economies. We've seen that open data and transparency need to be at the heart of the response, as well as the plans to build back better. And if anyone's interested in how to get started, please don't hesitate to get in touch. We're planning a follow-up events, um, hopefully next month to speak more about systemic forums to help the longer term, looking toward the recovery too. I'll stop there. Thank you. Well, many thanks Carrie, for sharing your perspective on the importance of clear and transparent data that resonates so much with our work and indeed the emergency put procurement in, in the spotlight as never before. I'm certain that the presentation from our keynote speaker provoked questions and reaction from our audience. I see a lot of questions coming throughout TED, and I will, I will encourage our audience to please, uh, continue with, uh, placing your questions, your comments in the TED in the end of the session. We will give a voice to all of you. Now, uh, we would like to open the floor to our panelists and we listen country's firsthand experience. To all of our panelists, we would like to hear your views uh on how being in the middle of the pandemic, uh. Affected your work? How is your experience with uh procurement under state of emergency and with what all what it entails? Can you please share with us today your country readiness to conduct, to conduct emergency procurement, available rules and regulation, practices in place, instruments or electronic platforms? What kind of measures were taken to respond to any policy or procedure gap. And finally, please share with us what worked well and what needed improvement or kind of a lesson learned. We will hear from each of the countries like a 10 minute brief discussion, and we will start with the experience of France that Ms. Ily will kindly share with us. Ms. Ili, the floor is yours. Miss Can you hear us? With mode. Yes, I can hear you. Can you hear me? Can you hear me? Great. Hello, everyone. Thank you. Very much for giving me the floor. I am very pleased to speak about this topic with you today. My name is Claire Ely. I am a legal expert on Public procurement for the Ministry of the Economy and Finance. If I'm speaking too fast, please do let me know. So that the interpreters can follow along. Now, in the case of France. We were very much affected by COVID, as you know. About 46,000 people have died to date, unfortunately. Starting in March of this year, we had to take very drastic measures to fight COVID. The main problem That we encountered. Were problems related to supply. At the beginning of the pandemic. And even before in February and going into March. We saw situations. That were extremely surprising, especially when we looked at the markets and the value chains. We saw a lot of cases where buyers. Bought up Masks or. Medicine and the goods weren't actually delivered. Because when. The goods arrived at the airport. Other countries, particularly the United States, rushed in and took. Those masks. And originally, those masks were supposed to go to some of the French overseas territories. So all of that to say where that we were in a situation where it was very difficult to uphold our principles. And sometimes it was hard not to play that kind of game. So, We wanted to. Get those goods back from the US government because we needed those materials as well. I'll also note here that France has very strict regulations on public procurement. Of course, European law also applies to us, but we go above and beyond European thresholds for procurement in France. And our public procurement principles are very strict. Uh, we emphasize transparency and that is the case for all situations, all cases of procurement. But that made things very complicated for us. Again, as I said, it was very hard not to, to get into that game of paying more in order to get the merchandise or equipment that we needed. And we also know that some companies took advantage of that situation. So what did France do? France had to urgently adapt some of its procurement rules. The most important thing for us, which I would note here. is for us to strike a balance. Between Flexibility on the one hand and upholding and applying our principles on the other hand. So we had to adapt our regulations. A Regulation was passed in March to make those changes. I'll summarize them here. Our main goal was to say that. This is only a temporary reform or modification of our laws. And buyers could enjoy some flexibility, but not in a systematic manner, not in every single case necessarily. So, if flexibility was offered to a buyer, The buyer couldn't come back later and say. Well, This contract holds for the duration of the emergency or the pandemic. The buyer would have to. Make sure that the flexibility would continue to apply to each contract that he was engaged in. So it was very important for us, I'm repeating this again, to make sure that we were not contravening our own public procurement laws. We needed to make sure that public procurement law was A way to protect us in the situation. And not the contrary. Starting in March of this year, France took a few different measures to facilitate the situation for buyers. And also to support various businesses and companies during the crisis. So to help buyers, we Offered a few new arrangements. Particularly, we decided to. Modify. Uh, the deadlines for receiving bids. What we decided to do. Was have a longer period during which we could receive these submissions. When you try to do something quickly, often the deadlines are very tight and very short, and we weren't getting any responses because those deadlines were too tight. And so we'd have to start the whole process over again. And a lot of companies, particularly French companies, came back to us and said, It would make things a lot easier if we had longer time frames to respond to these calls for tender. That would give everyone more of an opportunity to prepare themselves and send in a bid. And that really was a way to address the emergency was to allow for a longer submission period. Again, it was up to the buyer. To Send in the. The bid Now, We also looked at other. Uh, instances of procurement. We Wanted To continue to have open contracts as much as possible. But we did allow for negotiations to take place by video conference even though that wasn't something that was originally provided for in the law. There was enough flexibility for those conversations to take place over video conference. We also decided to cancel some of the site visits that would normally take place for certain types of procurement contracts. So, those were specific clauses or terms that we introduced. We also established a specific time frame during which these legal provisions would apply. So we made some changes. But we didn't want that to affect how we processed all of the bids. So even though we did change some of the parameters, we wanted to make sure. That we were not excluding. Suppliers from the. Bidding process. So, We were able to extend some of our contracts. Contracts that were already uh signed. And so some buyers had the option of extending their contracts by one additional month. But they couldn't go beyond a year-long extension. So That was the measure that we took and it only applied to certain contracts that were signed. So If a. Buyer had a contract that would expire during COVID. What we decided to do was to allow that buyer to extend the contract for a certain period of time until we were able to uh launch a new uh bidding process. So, again, we weren't trying to eliminate any competition, we were just trying to make sure that we were Able to continue with certain contracts, but these were limited cases. They weren't. Really going against the main principles that we have in place for our. Contracts. Some of these measures were taken to make things just a little bit easier for The uh bidders and our buyers. In some In some instances we were. Able to remove certain uh clauses that would specify uh what uh suppliers could be used as well. There were exclusivity clauses that we had in the past and some of these were slightly modified. We also saw that public procurement was a way to protect companies that found themselves in very complicated situations during uh this emergency period and protecting companies also means Protecting government money. Because No one wants to reduce, uh, competition or see competition reduced because companies are going bankrupt. In some instances. We have uh sanctions attached to contracts. If, for instance, the company does not uphold all of its obligations. But during the state of emergency, Uh, some of those were. Uh, adjusted, so we might have extended the execution period. If, for instance, the. The contractor wasn't able to execute the contract in the original time frame due to the pandemic. We also. Asked or allowed for buyers to show that. They weren't able to execute the contract, so they would have to provide some kind of proof or justification, um. Provide proof, in other words, that they were in a very difficult situation and that would justify the extension of the execution period or implementation period. We also worked with a range of companies and we. Also, Allowed Buyers to. Provide an advance at the beginning of the contract. In order to Not give priority only to companies that have a lot of cash or a lot of cash flow. So this Uh, helped out a lot of the companies that we worked with. The museum that is not. In the same way, we also have set out a number of denunciation measures and in this case, the buyer in uh had to um Winning on the contract and we had to uh compensate those companies. That were actually uh excluded from the possibility of contracting and uh bidding. So I will stop there and uh just about the uh emergency arrangements that we adopted, of course, in the emergency uh situation, which is, is still one, it is still, uh, this pandemic is still here and we are still in a state of emergency. I wanted to emphasize. The fact that the French Ministry of Economy and Finance uh decided it would be crucial to really stick to the guiding principles of public procurement in France where uh bidders are uh dealt with in a spirit of transparency and openness and in a spirit of competitiveness. We realized also That's when we, uh, were out of the very first urgent emergency situation that a number of these principles actually were not as effective as all that or efficient as all that and of course the fact that, uh, there was an exclusiveness was not so, uh, efficient and a number of companies in uh uh France who were asking not necessarily for that but at least to have the possibility of bidding and responding more effectively and efficiently to the market. And uh reacting in this way, and uh and, and not really just sort of evolving in the margins. Now, I hope this presentation was clear, and of course, if you have any questions, I'd be happy to answer them. Very insightful and it was particularly interesting the, the special attention that you've provided to the uh to the private companies. It's sometimes we, it is bypassed and it is very important that to uh emphasize that. Now we are moving to our next, next country, the panelist from Ecuador, another country that unfortunately was hit hard by the pandemic. Ms. Paes, the floor is yours. Miss Bass, you're muted. Can you hear us. OK, now we have you. Thank you. Can you hear me now? Yes. Very well. Thank you very much. First of all, I would like to thank you all for the invitation. It has been very important to hear the concept so far in terms of public procurement and I think that this is an important moment to think and uh implement all of the lessons learned from public contracting, public procurement, and the pandemic in the case of Ecuador, we had a process in which We declared the health emergency in Ecuador and we needed to adapt all of the public procurement processes. What do I mean by that? We have a technology system that is mostly digital and uh the public does have access to that system, but in terms of emergencies, The process does not necessarily go through procurement, rather, it is an exceptional process where the Companies where the entities. Carry out direct contracting because they are supposed to solve an immediate problem in addition to transparency and the competition. Opportunity also becomes an important concept in Under public procurement SE COP, the public procurement entity carried out several actions. First, they created rules, regulations, resolutions. 104 and 105. Asking the contracting parties to publish on a specific portal. Their actions and this was a portal for the emergency. Why did we make this decision? We made this decision. Because SERCOP, that is to say, the Ecuador's procurement entity does have Control over the pre-contract stages and they can carry out oversight and also implement processes whenever we have some findings or we see something is wrong. Clearly, during an emergency, everything goes by so fast, everything happens so fast that it is not possible to stop the processes whenever it is pre-contractual. So, first, We asked them to publish so we want this to be open data, so we installed an open data platform for the emergency so that At real time, all of the universities do in real time all of the universities and agencies do have access to the information. So it became a binding rule and it became a milestone, a landmark regulation in Ecuador. It did have its consequences, which were those consequences by having open data, by turning on the light. As I usually say, we turn on the light in a room that used to be dark, so we all started to see. How suppliers and contracting parties act and this is important to understand because also When we provide information, we need to have maturity, we need to be understandable of that information to properly digest the information and that was one of the decisions made. On the other hand, we do need to understand that the demand was all over the place. There was an increase of buyers and we had a decrease in supply, so for example, The respirators or the, or those who produce masks, they used input from supplies from China, but China was out of that and then prices were very volatile, we needed to understand the market and I also agree with Peter who already did this, we need to wonder whether and understand what would happen with the market, there was market failure. And another element is that the local supply was insufficient and not only locally but also internationally it became insufficient. So it was all over the place and it was insufficient and we had a great deal of uncertainty. We had asymmetrical information what was going to happen, how we were going to be Planning what the right price to buy was volatile prices and in addition to that we had a break in the global supply chain, all of these elements. Lead us to some, to try to analyze all of the details of the market. So the next option to have leverage power from the point of view of the state was to generate centralized purchases, consolidated purchases, so that we could have higher bargaining power with the providers, suppliers, and also to be able to create an impact on pricing. On open data on that platform that we had generated, we also saw how the providers had more information and they were able to sell to an agency at a certain price but to a different price, to a Different agency for the same good and on the same day and the same quantity. Why? They're playing, they're playing with the market. So we created, we enacted regulations and strategies for purchases and I think it is very important that every time we had the information, the actual data, we were able to Control concurrently, so we were limited in our scope of action, but whenever we had information, whenever we had, for example, communication with the universities, The public started to act. They started to present complaints and those complaints were straight to the office of the Attorney general and we started to control concurrently. So that was one of the impacts and also we had the feeling that there is greater corruption and as you have already presented some examples, how the resources were misused. We also saw that in Ecuador, the prices of masks. For example, that were in, in some cases, soccer fields were rented because of the pandemic for some activities and also some agencies that did not have specialization for the production of masks were actually producing them, the market changed and we have two options. One, we need to understand the market, or two, we also need to see what To the rest of the world. So this is an industrial reconversion, we do need to adapt the market, we need to increase the flexibility and These are actually questions, should we do all that? And another important takeaway in the case of Ecuador was that Procurement during the emergencies were important but when we opened up the data, since they were out there for the public, the individuals from the contracting agencies started to be afraid because they were going to be scrutinized by the public, so we needed to develop manuals training online. And uh during the emergency, we also trained the contracting agencies for 24,000 public servants so that they can act during the emergencies without making mistakes. This was good. It was good for them to think twice before buying something and also for them to get trained. In this regard, we also generated information which is necessary for decision making. We also created an open platform, open data. So CoraPublicas. EC and at this point we have had 200 million procurements during the emergency that have led to 9 to the To the participation of 911 agencies and we do have the ranking throughout the areas, the departments, the agencies. What was the result? This improved the information with the populations or COP got adapted to the To this open data and we also have this ISO for quality. And also against bribery, and in this case, all of the institutional processes are ready for an emergency, we also made all of these processes transparent, transparent, we allowed for oversight, we allowed for the communication of all of the information with um the citizens and we also allowed to communicate better information on the contracting entities and the Parties that are acting in this process, the dynamic part is what did we learn from all of this process, we, what are the lessons learned? First, we learned that the institutions need to be solid. We do have a test, the test is the pandemic that Tested the solidity and the response capacity of the institutions, so the institutions need to be solid and also have response capability. Technology is the best transparency tool. And also, the rule of law is not enough. We also need ways, there, there are always ways to avoid procurement, so we need to have law control, oversight and strong technology platform as to procurement. We need to talk about the comprehensive nature, that is to say, transparency, ethics, and during emergency. The opportunity, the timeliness of the actions and open data also includes the population as part of social control, social oversight to have concurrent control to generate governance and also decision making, therefore. When we look towards the future and the path to follow, we need to make Our own individuals within procurement more professional and open data should exist throughout the processes. We should also include citizens, train them, teach them. We also need to look into more modern technology for procurement and also. Think about the use of chatbox in artificial intelligence for helping the users, the intelligence within the business for suppliers and buyers and centralized purchases are some of the basic elements and this is the way that led Ecuador to create a project that we call centralized purchasing project for strategic supplies and medicines to have a transparent method. Thank you very much. Inspired for your insight and it is very interesting to see how you quickly reacted to fix any issues that may come out from your transparency of the data. Thank you so much. We have now to move on to our next country that will be Senegal, Mr. Nyang. I'm pretty sure that he's waiting to share with us, uh, the experience of Senegal. Thank you, Ms. Nay. Mercy, Madame Jasper. Thank you kindly. I hope you can hear me. Yes, to eat. Hello. Abumaandeka. As you know, The first COVID case, COVID-19, appeared in Senegal at the beginning of March 2020. And at the behest of all the uh countries affected, a number of specific adapted arrangements adapted to the situation were in uh applied in uh um in an emergency situation. So when you don't have a public procurement system at the outset, you have to create one and that may be insufficient, so you need to have additional measures adopted in order to uh complete your response. So our response was organized on two levels. First of all, a review of the codes of public procurement, as well as the existing arrangements, and then adapt these to the emergency situation as was the case when the pandemic struck. As well as the adoption of new uh measures better adapted to the situation and in order to better respond to COVID-19 in order to avoid, avoid a humanitarian crisis and with a number of uh humanitarian Uh, modalities as announced by the World Health Organization. By way of information, I'd like to recall that Senegal led a, uh, full reform of its procurement, public procurement market system in 2008 by applying the, um, WIMU directives. Eight countries are members of WIMMU and all the number of countries. We've started to internalize the uh directives in terms of public procurement with different, with different sectors. So this led to a way more directive, and that triggered the modification of a fundamental law. Which is the code of administration obligations, which devoted a number of important principles in terms of public procurement and orders. What was added or modified rather in this whole apparatus were rules that govern preparation, uh, markets contract award, as well as the whole public procurement, uh, process. All of this is stipulated in our decrees. And so there are specific categories of buyers and suppliers, but they can never uh be under or out of the cover of the specific uh rules of application. Another specific clause was added. And the same law actually prescribes that an open tendering bidding process is the actual mode of contract award and the contracting authorities by way of principle must have recourses, recourse to this, and there can be no waivers to those specific conditions as stipulated in our guidelines. Now simultaneously, simultaneously in the public procurement processes, a number. Of countries and. As All our member countries, this relies on the same directives with the transparency and openness of the procedure and a number of principles that actually had been difficult to reconcile with the requirements and means of selectivity and emergency. And in Senegal, there is an arrangement which is favorable to emergency acquisitions, especially when these are imperious, and there is a, a code which is the outcome of the 2018 reform that stipulates that in those situations where there is an extreme and urgent need, especially an unforeseeable consequence or something that happened and that falls beyond uh the contract. There has to be, there is an open procedure that has to be triggered and it has to be transparent. That same article. Extends the scope of application and this uh waiver to the markets with general mobilization measures as well as alert measures, red flag measures. At the same time, we have to recall that the direct processes stipulated by this article was submitted to uh control with a prior authorization of a priori contracting. Which stipulates according to the state which disposes of 24 hours to respond. Should there be an unfavorable reaction or notice because the state does not have to give a uh an authorization, but should there be an unfavorable notice, the contracting authority has to notify the supervising body. And then the Secretary-General of the presidency has to be notified and then a statement is made as to the unfavorable uh decision made by the uh Central Directorate of Public procurement, which is the a priori controlling and oversight entities. I, I can understand that some of these procedures. Actually, uh, pushed the, uh, public authorities during the pandemic to adopt a new decree and something that would be better adapted to responding to the pandemic and also preparing for future ones. And so the point here was to uh create an article which was adopted on March 18, 2020 and which excludes out of the scope of. Application of public procurement, the, the application of work, supply or services of supply of goods and services in fighting against the pandemic. So those two articles are important and were adopted. What is also important to mention is that the decree was not very precise as to the codes that would be eligible and so this leads the way to all sorts of interpretations. But of course, in these kinds of situations, what is feared is that some contracting authority behavior will actually engage uh uneligible and inadmissible um players, but of course, this does not put away the emergency uh procedures that have to be adopted in states of emergency and the obligations that I've just recalled, as well as the transparency arrangements. You will also agree with me that the choice of a confidential procedure and communication are constraints, but these are sound practices, of course, because it makes it possible to combine the uh Speed of action as well as safeguarding the principles and access to information in an open fashion. And of course, this allows for savings and guaranteeing of the quality of products. And so a part of the social budget that had to be allocated to the health sector in COVID-19. This also had to involve the uh acquisition of food supplies from Burkina Faso. And we also suggested that a new procedure, a confidential procedure, be launched within the framework of a direct competitive dialogue with several suppliers that had been selected after uh communication and publicity campaigns had been launched defining the specifications. Lotte contractant of the CD alale. Alou In addition to this example. We applied waivers so that some suppliers would be able to provide their. Goods more quickly. In some instances. The dispute committee had to get involved. And resolve some of these issues. Responses were provided, uh, which reflects the importance of the contracting authority and these commissions. These commissions exist to make sure that the scope of application is followed. The contracting authorities. Who wanted to. Undertake undertake direct contracting, often encountered issues and had to provide. A justification for why they wanted to use that specific type of contracting. In some instances, audits will need to be conducted to make sure that the contracts are in compliance uh with the decrees that have been passed. It is also important to note here that The The situation has really improved in Senegal a lot, and so some of these decrees have. Uh, been put to an end, uh, as the authorities determined that there really wasn't a use for them anymore, specifically because, uh, the pandemic situation has improved in Senegal. We also took measures in Senegal to stop the spread of the pandemic, and these were authorized by authorities at the beginning of the pandemic. There were restrictions on movement between regions and public and private gatherings. These measures were often difficult to reconcile with some of our public procurement rules. to, to, to share of the countries has a very rich experience now dealing with the pandemic, and I'm sure we can stay here for hours, but we have also to leave the floor to two other countries. Then, uh, I would please ask your permission to continue with our next speaker. We are now inviting Morocco to share uh and Mr. Labdawi to share his thoughts on On the topic and please Mr. uh Labdawi, if you can uh keep your discussion in 10 minutes, I would really appreciate it. Thank you. Thank you very much. I hope you're able to hear me. Allow me to introduce myself. My name is Abdelak Labdawi. I work. In Morocco on public procurement, and it is a pleasure for me to discuss this very important topic with you today. I'm going to share Morocco's experience with you today. My presentation. We'll discuss the following. The challenges of public procurement in Morocco. And I will also mention here that Based on data from 2019, uh, public procurement. Accounts for a, for 20% of GDP. And many of this goes to construction. The interpreter notes that there's a great deal of interference in the audio. Apologies. I think another microphone is on. No, everyone else is talking, can you please mute yourself? Thank you. Sebon mercy Public procurement. Accounts for a great deal of our economic activity, and it has a multiplier effect. On every sector of the economy. Let's talk a little bit about the context in which these measures were taken for public procurement. A state of emergency was declared. By a decree. On March 23rd of this year. And this decree is the legal basis for declaring the state of emergency and allows us to look at current regulation and adapt it to the circumstances of the time. With regard to the main provisions that Morocco took to address public procurement during the pandemic. A decision was made to focus initially. On The actual procurement process. And secondly, we focused on the execution of contracts. And finally, we adopted specific measures uh for the public health sector. With regard to measures taken that affected the procurement process itself, the main measures are as follows. We extended the Uh, validity period for certification for, uh, various entities that we worked with, laboratories, companies, etc. Some companies had certification for procurement that actually expired during the lockdown period and we had to make sure that their certification could be extended. At that time, we weren't able to meet in person to address that issue and so, We decided. To just extend the validity period of the certificates that we had already awarded to those companies and laboratories. As You know, we would, in the past publish our procurement announcements in physical newspapers or journals. So we decided to make a change there and publish those announcements electronically. Morocco. Starting in 2017 has advanced slowly but surely. Towards electronic systems. We hope to have all of this in place by 2021. But you also need to make sure that electronic signatures are possible. So that you can Authentify or authenticate rather, uh, the signatures, the electronic signatures. So that also needed to be addressed. So we decided to digitize all of the documents that are involved in the procurement process. So everything could be done electronically and that would allow procurement to take place without requiring people to physically travel. We also decided. To Make changes to our portal, our procurement portal and make it a little bit easier while at the same time ensuring the security and integrity of everything that was uploaded to that platform. Now let me move on to the 2nd set of measures that we're taking, taken. In some instances, we were able to extend the length of the contract, as my colleague from France mentioned as well. This, uh, prevented, uh, certain penalties from being applied. But of course, uh, proof or justification would have to be, uh, presented in order to extend those. Contracts. In other instances. We put a moratorium on certain payments that would have to be made uh due to uh the uh health emergency that was declared. We wanted to make sure that we weren't hindering companies in any way. Uh, especially if they were experiencing cash flow issues. We also required certain signatures for various parts of the contracting process. And so we decided. And not to uh ask for paper documents during the uh pandemic. A lot of this could be done electronically or electronic documents or electronic signature. We looked at other regulations as well. We looked at certain provisions. Uh, specifically. Uh, an article on payment. We had certain ceilings in place before the pandemic and uh we adjusted those ceilings. Uh, during the pandemic. We also granted. Other waivers that apply to other parts of the public procurement decree. In some instances, uh, certain contracts were awarded and it wasn't always necessary to go through a competitive, uh, process. Here, I'd like to Note that this kind of flexibility doesn't automatically mean that we completely ignored our main principles of public procurement, which is, uh, having open access to the procurement process. We kept files of everything. Everything is traced and you can always go back and, uh, look at all of the expenditures that were made to see if there were any discrepancies. We Also. Uh, made some adjustments to the rules governing the, uh, expenditures, uh, due to the circumstances of the pandemic. We decided to um stop these measures last August. Because there was no longer uh any justification for it due to uh the change in circumstances. Here, I'd also like to note that in 2019, we received 16,000 bids electronically over the entire course of the year. But for the 1st 10 months of 2020, we received 31,000 electronic bids, which is twice as many as we received the previous year. And this was mainly due to the extraordinary progress that we have made in uh going paperless for our procurement processes. Allow me to conclude here with just a few words. I think that we were successful in Morocco in countering the negative effects of the pandemic. Uh, thanks to the 5 following points. One, we adopted a preventive cooperative approach. 2, we have a strategic oversight entities. 3, we provided support measures and we'd already made a great deal of headway in going paperless. And we also, uh, made a lot of uh attempts to grant waivers when necessary. Thank you very much. Ms. Lavdawi, it was very interesting to see that Morocco is progressing so much in public procurement. Now we are going to our, uh, list, last but not least, uh, country representatives that is, uh, Ms. Hang from Vietnam. I would kindly ask Ms. Hank to take the floor and please turn your camera on. Ms. Hang. Ms. Han, can you hear us? Miss Hang. Do we have any Difficulties to connect with Hang. OK, in, uh, while we wait for Ms. Hang to connect, we can move on to and go in-house. And have our Speakers from discussions from the World Bank. Belita. Can you tube in and let us know your thoughts? From this discussion so far and also, OK, and also how the World Bank sees the COVID-19 response. Yes, thank you very much for having me. It was a great pleasure for me to be part of this distinguished and honorable panel. I enjoyed the discussions very much. Um, the presentations, the remarks by Peter and Carrie, very relevant and, uh, Um, very, um, informative and also thought provoking and the experience from colleagues in other countries. Um, in listening to all this discussion, um, uh, it, it seems that, uh, what I hear resonates with what, with what we have seen in, um, uh, bank, uh, engagement with countries during this period. And it is clear that countries all mobilized to uh adopt or adapt their legislation to the increasingly challenging and urgent situation of COVID-19. Um, different ways either triggering or enhancing the existing systems by direct contracting or non-competitive procurement. Uh, along with guidance and technical guidance or FAQs or uh tips and sheets to, uh, inform the procuring entities and help them come up to speed. In some countries, the fresh legislation to respond to the needs, in others, certain carve-outs from the procurement legislation itself. As for the bank, Um, in bank-funded projects, we also did the same in enhancing and simplifying our existing provisions. Uh, it became clear that while the focus of the government was to respond to the emerging needs to fight and contain COVID-19 to save lives, um, it is also clear that governments are struggling or at least are trying to balance the needs while procuring these large volumes of goods. We heard from KAERI about what $100 billion in 4 months with increased commercial and integrity risks associated with this procurement. We heard and uh we've seen exactly the same that while the focus is on COVID-19 response procurement, PPEs, ventilators, all these uh supplies that are needed to save lives, on the other hand, there is a whole universe of procurement that is already happening in the country. That is not directly related to COVID-19, but that is equally important. Infrastructure projects that were interrupted, schools, um, textbooks, uh, other, uh, health projects or health, health activities that were going on in different, um, sectors that were also disrupted and I see that, uh, while the focus of this discussion is on COVID-19 response procurement, that is very important to, to keep in mind. Um, and what I hear as well and what we saw in the bank, um, response, uh, uh, to COVID-19 in, in client countries that what is important is to integrate procurement in the larger operational risk framework. Procurement rules are not the magic bullet. Peter said it and he couldn't have said it better. This is not a legal issue but a market issue, a capacity issue, uh, in many cases, integrity issue. Um, so procurement is not The only puzzle, or a piece of the puzzle. It is a part of a conundrum where clients have to balance all these competing interests of responding to the emergency, ensuring transparency, but at the same time, um, delivering the goods that they need. Uh, digitalization of procurement procedures seems to have been the common theme that is our experience too that helped the countries to immediately respond but also to increase the transparency. And what this crisis meant is an opportunity for reform. First, professionalization of procurement workforce is even more important than just writing great rules, um, you know, that are, of course, the, the, the, the starting point but are not sufficient. Empowering and encouraging public officials to take decisions without fear of being, um, retributed, of retribution of Fear of being audited and, and being prosecuted. In many countries we have seen in response to procurement by COVID-19, um, lots of procurement officials are finding themselves into having to defend these decisions which on one hand, of, of course we can't do without accountability. On the other hand, we have to uh allow this, this balance that people take decisions in the interest of, of public interest. And finally, I would think since we have these lessons in the last 8 months, are we prepared now for the second phase of um of procurement of vaccines? Um, do we feel that, do, uh, we feel that we have in place, uh, and now we have the knowledge to implement all those lessons that we learned from the first phase in the procurement of vaccines which will be equally challenging and, um, I, I leave it there. Thank you, thank you so much, uh, Belita. I, I'm sure that if we can continue you can always guide us and let us know more on, on the procurement on, on under the bank view. But, but now we have Ms. Hang back. Ms. Hang, I'm sorry that we lost you for, for a second. Can I ask you to start with your presentation? Thank you. Yes. Can't you hear me well? Hello, everyone. Let me introduce myself. Uh, my name is Han. I'm working for the Ministry of Planning and Investment and, uh, under the Public procurement agency. Today, I'd like to share Vietnam's experience. In procurement. Uh, medical supplies and equipment in, uh, COVID pandemic. Uh, first, uh, in related to, uh, legislation in Vietnam, we have, uh, public procurement law. And in the law, we permit recruiting entity to use direct contracting for procurement in benefits. And uh the system in Vietnam is decentralized so that each procuring entity is in charge of what they buy. And How, how much do you buy and the price. And in our law, we also allow for a repeat order. So that if they, uh, if any supplier win. It's a bit before and now in when the big situation you NTT. Can apply. The same price and the same condition of contract to that uh particular goods, let's say, uh, any uh uh ventilator or any uh medical equipment. So that we can control the price and at the time as well. And uh that is in, in, in our law. Uh, I mean that uh in legislation, we allow uh flexibility for blue entity to buy the thing in time. And to enable action in dealing with benefit. But in practice, we face some difficulty. The first one is um the supply capacity. Uh, back to March and February. So you may, uh, let's say for example, for Medical mass is very high and it's increasing day by day. As you know that the population of Vietnam now is over 90 million people. So, in domestic, uh, we are like a mask. And Therefore, it uh Uruguay entity, I means it a hospital. Have to compete each other. To buy masks. And when uh we have a look at the data, it's at a price, uh, is the price different, differ. Between hospital and hospital. But luckily that um compared to the market price. Uh, supply its a hospital bed. is even uh much lower. It's about 1/3 or uh um half or half of the market price. But I fluctuated. And each hospital have different price for the mask. So that we decide to increase the domestic um supply. And the Ministry of Health and Ministry of Commerce work slowly with industry. To uh manufacture, manufacture the masks. And at the first stage, we don't have much uh surgical mask. So for the population, for the people outside hospital, we encourage them to use cotton. Uh, masks that the Vietnam can do, uh, as much as, as we want because we export a lot of garment products. So for cotton masks, uh, it is easier for us. So we encourage people to use cotton masks. And uh to live, uh, to save the surgical mask for hospital. And then in uh Apple and May, and we agreed to supply so that even for surgical uh marks or cotton mug, uh, we, we have uh a very high production of these goods and we even can export to overseas for masks. That is the, the, the for, uh, we, we face, uh, in supply and we try to overcome it. And now we become a spotter for it. And the second one is a ventilator. Uh, in Vietnam, we We are, uh, we have a very limited number of ventilators. We have more than 90 million people. But uh throughoutucachi, we only have more than 4000 ventilators. And luckily for Vietnam that we control the ban, ban the week very well and until now, we only have uh 1300 Yeah. Infected people. So I don't know if uh the number of infected people increase fast. I don't know what, what will happen for Vietnam. Maybe we, we will become in panic. Uh, at that time, because we only have 4000, uh, ventilator, and it is not easy to buy even with contract, um, direct contracting because there's no supply. Uh, in other country, they forbid export. So what we try is that we um Uh, we buy, uh, a ventilator is stuck in Vietnam. And after that, we try to persuade our industry. To manufacture ventilator. And one big guy in Vietnam, do that follows. And, and they now even export so that uh in case of uh ventilator, we, we can, Vietnam can produce and uh we don't have much pro profit with that. At present, and now. And um Uh, that is the, the, the first difficulty, which is the supply capacity. And we try to, to, to produce domestically. And the second one is uh the price of the other medical equipment. And with modern uh medical equipment, we cannot produce ourselves. We have to embark. But the price is very, very, uh, differ and it, it, it, it, it differ from hospital to hospital, from that province to the other province, and that is a difficult question for us that, uh, how to manage the price. We give the flexibility to hospital. And to province because the system in Vietnam is to change your life, but I have to, I have to stop you here because unfortunately, we are running out of time and I'm, I'm really sorry that I'm interrupting you and we need to yes, yes. You are, yes, yeah, well, the, the time is going tense, so we are trying to, to keep everyone, uh, giving the opportunity to speak to all our distinguished guests. I will now move to, uh, Francisca. Thank you, thank you very much, Ms. Hang, and I will now move to our practice manager of health, Miss, uh, Francisca, um. Thank you. Can, can you hear me? Can you hear me? Yes, yes, we can. Yes. Great. Thank you. Uh, this has been a very rich session and, uh, we could obviously have spent a lot more time on this. The, the, the two speakers, um, really gave a good oversight of some of the challenges and some of the, I'll just go quickly over some of the things that I picked from. The discussions and the, the, the speakers as well as the panelists. Um, Peter's point about, uh, we need to have a multi-sectoral approach to this. It's not just a legal issue. It's not just a procurement issue. We also need to have the technical people as part of this. And one other important um entity that uh uh uh uh Carri brought in is the civil society and the journalists, uh, because if they're not part of the process and being carried along, they end up being those that bring out. Highlight the problems that we face and that is one of the um issues that we're facing in one of the countries that I face, that I manage is that uh it's the, it's the civil societies and the media that are complaining about how the process, the procurement process have not gone very well. And that the monies have not been used as appropriate and supplies are sitting in, in, in, in storage and not being utilized, um, cost of, of, uh, procurement were too high. So the thing is, it's important to carry the civil society and the journalists along from the very beginning so that the more people know about what is going on, the more people know about the challenges that this, uh, the, the, the government is facing in this difficult situation, the better you are able to carry them along and then They're also, they also act as checks and balances for the system. And the other point that I, I, I took from all this is it, it's not just having emergency procedures and guidelines in place, but also revisiting them. On a regular basis, um, for pandemic preparedness, we do what we call simulation. So you have a plan, you have an operational plan, but at least once or twice in a year you actually pretend as if there is a pandemic and you actually go through the process so that all pieces, all the different parts of the puzzle actually have a, a chance to work through it to see that the system, the, the procedures that you have put in place are working. Um, and, and, and that's why I would say it's good to have like a dry run during non-emergency periods of some of these emergency procedures that we, we put in place to be able to fast track a lot of the procurement. Um, um, if we don't do that, uh, there's a chance that people who we think are, are, are knowledgeable have forgotten the procedures and then don't follow it at the time of um um of, of the emergencies. Um, if we're, if, if, if we also have to be conversant that it's the same set of human resources that are doing things that maintain the essential services. Somebody also talked about, look, it's not just addressing an emergency at the time. There are other regular things that need to continue, but it's the same sets of human resources that have to do everything, so they need to be up to speed about what are the things that they need to do to maintain essential services and what are those special. Um, systems that need to be, um, put in place during the emergency procedures. We had a good set of, um, um, panelists discussing about their experiences in the, the various countries and their very rich uh um experiences and I hope people have been able to learn some things from there and, and for me, um, maybe just to speak about some of the, um, um, situations that we, we faced, uh, uh, in a few of the countries that I, I managed as part of putting the um COVID operations together. We did in some cases apply the retroactive financing so that um while the projects were being put in place, the governments had the leeway to be able to continue with their processes, um, making sure that they followed the required rules so that once the projects were effective, then it was very easy to um um um reimburse the government's expenses as part of the, the, the, the, the grants or the loans for the countries. There was a lot of use of data and technology to monitor the processes. In one of the countries that I work on, and they use that data, the, the, the information they got from that data to constantly change the operating plans to make sure that things were going in place. In other countries they had emergency procedures that allowed increasing thresholds, um, allowed requests for proposals to, to be made by the same set of suppliers that they are already known. Because there are lots of cases where um um suppliers that are not known that are just popping up because taking advantage of the situation um um came in to put, put um requests for proposals um in place. So using having a set of suppliers that you know can help at least for those basic things that need to continue um is a good thing. Then there was also a lot of direct contracting um, um, and, and using um established firms. Um, um, and, and then also making sure that the media and the civil societies are carried along like I mentioned before. So this has been a very rich experience and I thank everybody for, for, for helping me to learn about these experiences as well. Um, and I look forward to any, um, um, questions that come up. Unfortunately, I might have to disconnect in about a minute or two, but thank you very much. Thank you, thank you very much. Cesca, thank you for your thoughts. And now we are going to take two questions, but all the questions will be responded in our, uh, blog. So please continue posing your question. We will make sure that every single question is is responded. I saw Mr. Trete that was very active responding, uh, through live chatting with our participants. Now we have one question for, uh, Carre. If you can help us, uh, with, with this question, it's still realistic to consider COVID-19 pandemic as an emergency situation. Isn't it time for countries to set more realistic short to medium term procurement strategies or visions in response to COVID-19 instead of continuing to work under emergencies crisis situation? Sure, I, I wish I had a, a clear answer to that. I think as Peter mentioned in the chat, that is definitely the million-dollar question. Um, but it's something that we're actively thinking about as we start to transition, I guess, to thinking about this as a longer-term problem and then also eventually to the recovery. Um, but something to echo what Ayo was just saying, um, I think one of the key things that we've seen is that there is a, a positive role that civil society can actually play. In the process itself. Um, I think some of the recommendations that I mentioned, um, and, and we put up, um, included in my slide, and we also have a full blog about it that I'm happy to share. Um, for inclusion in, in the follow-up, um, but some of those recommendations such as having clear policies that are sort of published and open and everyone is on the same page about what's happening, having open data that people can access, everyone can mute if it's not talking, we have a lot of interferences. OK, thank you, sorry. No, no worries. Um, But I think some of these, um, Some of these key recommendations that have come out in the context of COVID are relevant anytime, even when it's not in a pandemic. Um, and I think that's something important to, to recognize. Um, the clearest thing that we've seen is countries that are already implementing open contracting that have open data that different actors are able to use and analyze. They've been able to react better in the face of the pandemic, um, but that continues even in normal times as well. So I think a lot of the recommendations that have come up today are relevant, even when it's not a, an emergency, urgent emergency situation. Thanks. Thank you, Carol. Thank you. I, we will now, uh, have a question for Ms. Lee. I, I don't know if Ms. Lee is still online. Is it clear, can you hear us? There was a specific question about France and how they use types of verification, what types of verification they requested from the buyers. Is the flu? Well, um, I think that all the, all our questions can be asked in, in blog. hello? I think it's. We Could you please repeat the question? Thank you. Yes, it would be interesting to know what types of verification was requested from buyer on the use of purchasing procurement. We are struggling to measure the impact of COVID-19 financing. So what kind of verification was, were requested from buyers? Uh. I'm not exactly sure which type of verification uh you're referring to specifically, but buyers mainly had to provide uh uh verification. Uh, that had to do with protecting workers' health and environmental, uh, considerations. I'm not sure if those are the types of verification that you were, uh, referring to. Everyone that had this kind of question, they can further develop in the chat and then we can uh continue to respond to this question afterwards. Now, as this session unfortunately is coming to an end, I would kindly ask Cuba to summarize, to give her final conclusion on the event. Thank you. Thank you very much, uh, Maniola for excellent moderating of this session. Uh, it's very difficult to summarize, but, uh, of course, we all learn from each other. Um, when is it an emergency and when uh governments could possibly start planning for these emergencies. The pandemic started as an emergency, but now we know the, the, the needs. We know uh that after the, the first procurement for uh protection of health, uh, there is a procurement for vaccines, so this can be planned. Um, we learned from our speaker. that uh while we work on expedited procedures, we still have room to be transparent, to use open contracting data um uh forms uh to, to verify the impact of the procurement, whether it reached its intended beneficiaries. Um, there is a lot of experiences that we learned from the different, uh, esteemed speakers and panelists. Uh, and I hope that this discussion among procurement practitioners, academicians, and government officials continue, uh, before, uh, ending this session, which we're 6 minutes overdue. Uh, I want to thank, uh, Nagaraju who is chairing the community of practice for procurement for development. And thank Manola for organizing this and thank you all esteemed speakers and panelists for participating with us. I look forward for more collaboration with all of you, maybe on different topics. And thanks, we will uh distribute. And uh circulate the, the minutes of uh this session and probably a, a blog later that we can um uh email it to all of you. Thank you very much and stay safe. Hopefully, this pandemic will end soon for all of us. Well, thank you, thank you very much. Thank you too. Thank you. Many thanks everyone.
showAllTranscripts
no
duration
PT2H7M23S
scene7File
worldbank/20201119-Public-Procurement-ENG
scene7Domain
https://worldbank.scene7.com/
scene7FileAvs
worldbank/20201119-Public-Procurement-ENG-AVS
title
20201119 Public Procurement ENG
description
20201119 Public Procurement ENG
showTimestampAndTranscript
no
col-xs-12
col-sm-12
col-md-3
col-lg-3
col-xs-12
col-sm-12
col-md-7
col-lg-7
  • add-style
  • lp-body-content
col-xs-12
col-sm-12
col-md-2
col-lg-2