- Overview
Link to information: https://ahmedabadcity.gov.in/ViewFile/ViewFile?TYPE=FileRepository,2511
Description:
The Government of Gujarat through Ahmedabad Municipal Corporation is implementing the World Bank aided Gujarat Resilient Cities Partnership: Ahmedabad City Resilience Project. Ahmedabad is presently served by multiple Sewage pumping stations, Terminal pumping stations(TSPS), wastewater treatment plants (WWTPs), Stormwater pumping stations etc.
There are new facilities which are under planning and construction. At present data of some of the STPs and SPS is being transmitted at Central Wastewater SCADA, proposed system is to upgrade the Wastewater SCADA system and hook up all STPs, SPS and TSPS along with Sewer network. The pumps at these SPS/TSPS are manually operated, AMC needs to establish processes which enable technology and digital assets to managed city wide resources on a real time basis through the Integrated Command and Control Centre. Hence, a new city-wide SCADA system with analytics is envisaged at Central Wastewater SCADA centre to facilitate AMC to monitor and manage the assets efficiently.
Ahmedabad Municipal Corporation invites you to participate in an Early Market Engagement (EME) session for our upcoming procurement package “Implementation of SCADA System with allied infrastructure for Wastewater Infrastructure for City of Ahmedabad” under the GRCP - ARCP Project.
For more information, see here.
Contact information: Mr. Mirant Parikh (IAS), Project Director, Email: cewrm@ahmedabadcity.gov.in; and piugrcdpamc@gmail.com