Print This Page Country Matrix: Scale and Formats of Performance-based Practices in Several Countries

The country matrix provides an overview of PBCs as used across the world, in both developed and developing countries. The data shown were drawn from the WB publications and archives, and from country-based information available in published form, including both printed and web-based sources. PBC formats vary from country to country, having been tailored to accommodate the specific needs of each country, match the capacities of its public and private sectors, and fit into the relevant regulatory and administrative frameworks.

The matrix shows road types covered by PBCs, when the countries started utilizing PBCs, the main contract parameters (length of tenure, road length, contract types, and services included), contractor selection criteria, and the documents available for further study. The highlighted links in the ‘country’ column lead to detailed case studies, while the links in the ‘practical documentation/websites’ column lead to bidding, contract or study reports of the respective countries or websites where additional information can be found on the status of PBCs in these countries.

The next table provides a glossary of abbreviations, which are used throughout the Country Matrix:

Full wording of abbreviations used in the country-issue matrix
yrs – years
+ - renewal option
AC – avalanche control
C&S – cleaning & sweeping
CM – corridor management
CuM – culvert maintenance
DM – drainage maintenance
ER – emergency response
ElM – electrical maintenance
EM – emergency maintenance
LM- landscape maintenance
LiM – lighting maintenance
OH –overheads
P – patrolling
PM – periodic maintenance
PrM – preventive maintenance
Regrav - regraveling
Rehab – rehabilitation
Resurf – resurfacing
RM – routine maintenance RoM – road/line markings
SW – seal widening
SfM – surface maintenance
SM – sign maintenance
StM – structure/bridge maintenance
SuM – summer maintenance
TSS - traffic signs & signals
VC – vegetation control
WM – winter maintenance

To learn about the experience of countries in different regions please follow the given below links:

Africa and Middle East
Europe
Latin America and the Caribbean
North America
South-East Asia and the Pacific

The list of countries that are interested in applying a PBC approach is growing. The following countries have, as of the beginning of 2006, started developing PBC programs, arranging for training, designing bidding packages, etc.: Albania, Burkina Faso, China, Democratic Republic of Congo, Egypt, Indonesia, Kenya, Lebanon, Nigeria, Pakistan, Paraguay, Poland, Romania, Vietnam and Yemen.


© 2006 The World Bank Group , All Rights Reserved.