Construction & Maintenance


Example of Construction Costs in Japan

Item

Unit

US$1

 
Ready-mixed concrete
(strength) 16 - 40 N/mm2
(slump) 8 - 21 cm
(aggregate) 25 mm
m3 $112.0 - $149.5 Tokyo, carried in the site, assumed volume:
1000 - 2000 m3
Normal Portland Cement t $89 Tokyo, carried in the site, assumed volume:
300 - 1000 tons
Steel Plate (size)
6@914@1829mm to
25@1524@6096mm
t $400 - $450 Tokyo, carried in the site, assumed volume:
20 - 30 tons
Asphalt Mixture
(aggregate factor 13 to 20)
t $67 - $87 Tokyo, carried in the site,
assumed volume:
200 - 2000 tons

Cut-back Asphalt for surface treatment

t $940 Kanto (region of Tokyo), carried in the site, assumed volume:
10 tons
1Exchange rate used: US$1 = 100 JPY
Source: Kensetsu Bukka, February 2000, by the Kensetsu Bukka Chousakai foundation